Text
y
-
-
- *
,
.- ~.
JAN. 2 c 1983
Docket No.
50-29
. Yankee Atomic Electric Company
ATTN:
Mr. L. H.-Heider
Vice President of Operations
671 Worcester Road
Framingham, Massachusetts' 01701
Gentlemen:
Subject:
Inspection'No. 50-29/82-15
This refers to the routine safety inspection conducted by Mr. S. Collins of
this office on November 16 - December 31, 1982 at Yankee Nuclear Power Station,
Rowe, Massachusetts of activities authorized by NRC- License DPR-3 and to the
discussions of our findings held by S. Collins and Mr. N. St. Laurent of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspec-
tion Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Based on the results of this inspection, it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as set
forth in the Notice of Violation, -enclosed herewith as Appendix A.
These
violations have been categorized by severity level in accordance with the NRC
Enforcement policy (10 CFR 2, Appendix C) published in the Federal Register
Notice (47 FR 9987) dated March 9, 1982.
You are required to respond to this
letter and in preparing your response, you should follow the instructions in
Appendix A.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application.to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the require-
ments of 2.790(b)(1).
The telephone notification of your intent to request
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files, Mail and Records,
USNRC Region I, at (215) 337-5223.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
1
l
0FFICIAL RECORD COPY
\\
,6
8302070344 830124
9
gDRADOCK 05000029
, _ _
-
__
_ - .
- - . -
_._..,__--.-......_--._....d
.
.
Yankee Atomic Electric Company
2
l
1
Your cooperation with us in this matter is appreciated.
'
Sincerely,
ni;.'ul 21.. ; 2 3D
Richard W. Starostecki, Director
Division of Project and Resident
Programs
Enclosure: Appendix A, Notice of Violation and NRC Region I Inspection
Report Number 50-29/82-15
cc w/ encl:
11. Autio, Plant Superintendent
J. E. Tribble, President
J. A. Kay, Senior Engineer - Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts
bcc w/ enc 1:
Region I Docket Room (with concur rences)
Senior Operations Officer (w/o encis)
DPRP Section Chief
i
1
l
N
,y
j ,
C'fl1(1ns
RI:DPRP
R 1. P fX D
W/.IRP
R :DPR
'
Gal o/ 1m ,
Greenman
5fvre,rc1"i
%
OFFICIAL RECORD COPY
,O
/
\\f\\V
.
a.m