ML20028G027
| ML20028G027 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 02/03/1983 |
| From: | Tucker H DUKE POWER CO. |
| To: | Adensam E, Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20028G029 | List: |
| References | |
| NUDOCS 8302070332 | |
| Download: ML20028G027 (2) | |
Text
-
1 i
,e.
o Duxe Powen Go>tmxy j
P.O.1HW !):llilO CIEAug. orts:, N,0, 246212 llAL 15. TUCKER n i e rmnr.
.......n, no. nim..n.n
- u......
February 3, 19533 i
)
Mr. 11arold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Ccamission
{
Washington, D. C. 20553 Attention:
Ms. E. G. Adensam, Chicf Licensing Branch No. 4 Re: McGuire Nuclear Station, Unit 1 Docket No. 50-369
Dear Mr. Denton:
The attached report describes the program to be implemented by Duke Power Company at McGuire Nuclear Station - Unit 1 to address the recommendations made by the Design Review Panel (DRP) in its report " Utility Design Review
?anel D2/D3 Steam Generator Design Modification" which was submitted on January 17, 1983, i
It should be noted that the inspections required after approximately 6 months 1
of op' ration will be performed on McGuire - Unit 1 during the first refueling l
shutdcwn since the Unit I reactcr core has approximately 200 effective full power days remaining.
It is concluded that performance of the identified
]
inspections at the first refueling shutdown is consistent with the requirement to perform these inspections at ter approximately 6 months of operation with j
the modified steam generators.
I l
In discussions with NRC Staff representatives, it was indicated that either a license condition or technical specifications would be placed on the program for verifying acceptability of the modifications. Accordingly, the following is a recommended license condition for inclusion in the McGuire - Unit 1 Facility Operating License:
0 a:
The licensee shall conduct the inspection, testing and monitoring program as described in the attachment to Hal B. Tucker's letter of gg February 3, 1983. The licensee shall not make any major modificaticas no to this program unless prior NRC approval is received, s
min O(
Major modifications are defined as:
"8 a.
Elimination of any identified testing, inspection or monitoring, b.
Changes in the frequency of performing the identified testing, g
inspection or monitoring, and g
c.
Reduction in the scope of any of the identified testing, inspection or monitoring.
/
(* N
/YM c. Nad/(
- r.My."
001
. a Ae
- r. & 3
- q. rad" n
Ph.#
- g. a.k.n
l c
i i
Mr. Harold R. Denton, Director l
February 3, 1983 Page 2 i
i t
Please advise if additional information or clarification is needed concerning the attached program.
l l
Very truly yours, i
c a'/
'Y
-e v
Hal B. Tucker GAC/php i
Attachment 1
[
cc:
Mr. W. T. Orders i
Senior Resident Inspector
]
McGuire Nuclear Station 4
,r
~
Mr. James P. O'Reilly, Regional Administrator U. S. Nuclear Regulatory Commission
]
Region II l
101 Marietta Street, Suite 3100 1
I Atlanta, Georgia 30303 i
i Dr. M. W. Wambsganss Argonne National Laboratories i
9700 South Cass Avenue, Bldg. 335 l
Argonne, Illinois 60439 j
r i
[
l l
t f
l P
f t
m.-
-_-._,. _.,~. _,-..~.-.- _,.--- -__ -.
,-,r-_,
.,_,-._,,.~.,.-m,,-
,,,r.-.-,...