Interim Deficiency Rept Re Pullman-Kellogg Pipe Lining Failure in Essential Cooling Water Sys.Investigation Continuing.Final Rept Will Be Submitted by 830405
ML20028F969
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/26/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22823-GHD, ANPP-22834-GHD, DER-82-51, NUDOCS 8302070254
Download: ML20028F969 (2)


Text

. .

==

Docket Nos. 50-528/529/530 g ..

50.55(e) Report B'en 5hD Arizona Public Service Company /3y Po DOx 21666 + PHOENIX. ARIZONA 85036 At ]/

u!!? e, January 26, 1983 -/

ANPP-22823-GHD/BSDg4n..,

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: Mr. D. M. Sternberg, Chief 1 Reactor Projects Branch 1 j

Subject:

Time Extension for Report - DER 82-51 A 50.55(e) Potentially Reportable Deficiency Relating to Pullman-Kellogg Pipe Lining Failure in Unit #1 Essential Cooling Water System File: 83-019-026 D.4.33.2 l

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on September 10, 1982 (B) ANPP-21973, dated October 8,1982 (Interim Report)

(C) ANPP-22433, dated December 1,1982 (Time Extension)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it l

was estimated that a Final Report would be available by February 8, l 1983.

Due to the extensive investigation and evaluacion required, it is now expected that this information will be finalized by April 5, 17"3, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,,

Cl G Lli r l E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske cc: See Attached Page 2 9

8302070254 830126 PDR ADOCK 05000528 8 PDR

w U. S. Nuclear Regulstory Commission Attention: Mr. D. M. Sternberg,-Chief ANPP-22823-CHD/BSK January 26, 1983 l Page 2 cc: Richard DeYoung Director Office of Inspection and Enforcement j U. S. Nuclear Regulatory Commission

Washington, D. C. 20555 j T. G. Woods, Jr.

, J. A. Roedel D. B. Fasnacht i

G. C. Ar.dognini J. R. Bynum B. S. Kaplan W. E. Ide A. C. Rogers J. Vorees 2

J. A. Brand -

A. C. Gehr W. J. Stubblefield W. G. Bingham R. L, Patterson R. W. Welcher R. M. Grant D. R. llawkinson

L. E. Vorderbrueggen a G. A. Fiorelli P. P. Klute l

Lynne Bernabei, Esq.

llarmon & Weiss j 1725 "I" Street, NW

Washington, D. C. 20006 -

i i

R. L. Greenfield Assistant Attorney General Bataan Memorial Building 3

Santa Fe, New Mexico 87503 i

l i

4

.h

/