ML20028F969
| ML20028F969 | |
| Person / Time | |
|---|---|
| Site: | Palo Verde |
| Issue date: | 01/26/1983 |
| From: | Van Brunt E ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR |
| To: | Sternberg D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, ANPP-22823-GHD, ANPP-22834-GHD, DER-82-51, NUDOCS 8302070254 | |
| Download: ML20028F969 (2) | |
Text
.
Docket Nos. 50-528/529/530
==
g 50.55(e) Report B'en 5hD Arizona Public Service Company
/3y At ]/
Po DOx 21666 + PHOENIX. ARIZONA 85036 u!!? e, January 26, 1983
-/
U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. D. M. Sternberg, Chief 1
Reactor Projects Branch 1 j
Subject:
Time Extension for Report - DER 82-51 A 50.55(e) Potentially Reportable Deficiency Relating to Pullman-Kellogg Pipe Lining Failure in Unit #1 Essential Cooling Water System File:
83-019-026 D.4.33.2 l
Reference:
(A) Telephone Conversation between J. Eckhardt and G. Duckworth on September 10, 1982 (B) ANPP-21973, dated October 8,1982 (Interim Report)
(C) ANPP-22433, dated December 1,1982 (Time Extension)
Dear Sir:
The NRC was notified of a Potentially Reportable Deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it l
was estimated that a Final Report would be available by February 8, l
1983.
Due to the extensive investigation and evaluacion required, it is now expected that this information will be finalized by April 5, 17"3, when a complete report will be submitted.
There is no new information or change to the Interim Report at this time.
Very truly yours,,
Cl G Lli r
l E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske cc: See Attached Page 2 9
8302070254 830126 PDR ADOCK 05000528 8
w U. S. Nuclear Regulstory Commission Attention:
Mr. D. M. Sternberg,-Chief ANPP-22823-CHD/BSK January 26, 1983 l
Page 2 cc: Richard DeYoung Director Office of Inspection and Enforcement j
U. S. Nuclear Regulatory Commission Washington, D. C.
20555 j
T. G. Woods, Jr.
J. A. Roedel D. B. Fasnacht i
G. C. Ar.dognini J. R. Bynum B. S. Kaplan W. E. Ide A. C. Rogers J. Vorees J. A. Brand 2
A. C. Gehr W. J. Stubblefield W. G. Bingham R. L, Patterson R. W. Welcher R. M. Grant D. R. llawkinson L. E. Vorderbrueggen a
G. A. Fiorelli P. P. Klute l
Lynne Bernabei, Esq.
llarmon & Weiss j
1725 "I" Street, NW Washington, D. C.
20006 i
i R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 3
i i
4
.h
/