Interim Deficiency Rept Re Pullman-Kellogg Pipe Lining Failure in Essential Cooling Water Sys.Investigation Continuing.Final Rept Will Be Submitted by 830405
ML20028F969
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 01/26/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22823-GHD, ANPP-22834-GHD, DER-82-51, NUDOCS 8302070254
Download: ML20028F969 (2)


Text

.

Docket Nos. 50-528/529/530

==

g 50.55(e) Report B'en 5hD Arizona Public Service Company

/3y At ]/

Po DOx 21666 + PHOENIX. ARIZONA 85036 u!!? e, January 26, 1983

-/

ANPP-22823-GHD/BSDg4n..,

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief 1

Reactor Projects Branch 1 j

Subject:

Time Extension for Report - DER 82-51 A 50.55(e) Potentially Reportable Deficiency Relating to Pullman-Kellogg Pipe Lining Failure in Unit #1 Essential Cooling Water System File:

83-019-026 D.4.33.2 l

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on September 10, 1982 (B) ANPP-21973, dated October 8,1982 (Interim Report)

(C) ANPP-22433, dated December 1,1982 (Time Extension)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), an Interim Report was transmitted by Reference (B), and a Time Extension was requested by Reference (C). At that time, it l

was estimated that a Final Report would be available by February 8, l

1983.

Due to the extensive investigation and evaluacion required, it is now expected that this information will be finalized by April 5, 17"3, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,,

Cl G Lli r

l E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske cc: See Attached Page 2 9

8302070254 830126 PDR ADOCK 05000528 8

PDR

w U. S. Nuclear Regulstory Commission Attention:

Mr. D. M. Sternberg,-Chief ANPP-22823-CHD/BSK January 26, 1983 l

Page 2 cc: Richard DeYoung Director Office of Inspection and Enforcement j

U. S. Nuclear Regulatory Commission Washington, D. C.

20555 j

T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht i

G. C. Ar.dognini J. R. Bynum B. S. Kaplan W. E. Ide A. C. Rogers J. Vorees J. A. Brand 2

A. C. Gehr W. J. Stubblefield W. G. Bingham R. L, Patterson R. W. Welcher R. M. Grant D. R. llawkinson L. E. Vorderbrueggen a

G. A. Fiorelli P. P. Klute l

Lynne Bernabei, Esq.

llarmon & Weiss j

1725 "I" Street, NW Washington, D. C.

20006 i

i R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 3

i i

4

.h

/