Interim Deficiency Rept Re Preoperational Testing Failure of ESF Actuation Sys Dc Power Supply Ground Detectors.Final Rept Will Be Not Be Submitted Until 830325 Due to Extensive Evaluation
ML20028F954
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/26/1983
From: Van Brunt E, Vanbrunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22822-GHD, DER-82-62, NUDOCS 8302070221
Download: ML20028F954 (2)


Text

_

50-528/529/5 %a,,,O Docket No.s.

\\

l:7 '

50.55 (e) Report Arizona Public Service Company dl

/g, fy', C [

eo sox zue. PHouax. AmZONA 85036 hCC!"r,.

l January 26, 1983

, !!C ANPP-22822-CHD/BSK i

l U. S. Nuclear Regulatory Commission Region V I

Creekside Oaks Office Park 1450 Maria Lane - Suite 210 4

Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 82-62 A 50.55(e) Potentially Reportable Deficiency Relating to ESFAS DC Power Supply Ground Detectors Supplied by CE Failed Preoperational Tests 4

File: ca-029-026 D.4.33.2 (A) Telephone Conversation between J. Eckhardt and

Reference:

4 G. Duckworth on October 21, 1982 (B) ANPP-22369, Jated November 22, 1982 (Interim Report)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by February 9, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by March 25, 1983, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

\\

C C(

CLLL' M LLL C

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/ Gild:ske cc: See Attached Page 2 m y

\\

I 8302070221 830126 i

t PDR ADOCK 05000520 S

PDR l

SIU""

ee U. S. Nuclear Regulatory Commission Attention:

Mr. D. M. Sternberg, Chief ANPP-22822-Gild /BSK January 26, 1983 Page 2 i

i cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nucicar Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum B. S. Kaplan W. E. Ide A. C. Rogers J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli P. P. Klute Lynne Bernabei, Esq.

liarmon & Weiss 1725 "I" Street, NW Washington, D. C.

20006

~

R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 L