j
']D-Mt%
N P O W E R & L 1 G H T! P O BOX 6008
- NEW ORLEANS. LOUISlANA 70174 142 DELARONDE STREET
- (504) 366-2345 UTsuTIES SYSTEM L. V MAURIN January 7,1983 Voce Presstent Nuclear Operations W3P83-0010 3-A1.01.04 3-J22 Pre-Fuel Load 0
Co Director i
g Nuclear Material Safety and Safeguards O
g33gg U.S. Nuclear Regulatory Comission 2
_g Washington, D.C.
20555 mal 1 #11983 >
Nyss
SUBJECT:
Waterford 3 SES Malt SECDON O
Specia' Nuclear Material License Application s
DOCMET CLERx Docket No. 70-2946 4,
t 3
Dear Sir:
This letter provides responses to questions on the subject application that were asked in a telephone conversation between your Mr. B. Serini and our Mr. B. Wilkins on January 3, 1983. Please insert the attached responses in our application.
Should you have any questions on this subject do not hesitate to contact us.
Yours very truly, f
.//:
7&uur L. V. Maurin LVM/RMW/pjl cc:
S. Black, E. Blake, W. M. Stevenson
_,.R I,f as10 96" p se
- t,n w
Lfbc. asia l-
/Q, j ~, M,?i e f
8302040029 830107 p/7 PDR ADOCK 07002946 C
~
o>
TABLE OF CONTENTS SECTION PAGE I-1.0 General Information 1.1 Reactor and Fuel 1
i 1.2 Storage Conditions 2
1.3 Physical Protection 5
1.4 Transfer of Special Nuclear Material 6
1.5 Financial' Protection and Indemnity 6
2.0 Health and Safety
-2.1 Radiation Control 7
2.2 Nuclear Criticality Safety 8
i 2.3 Accident Analysis 11 3.0 Other Materials Requiring NRC License 3.1 Startup Sources 11 Appendix A.
.'esponse to NRC Request for Additional Information Appendix B.
Response to NRC Telephone Request for Additional Information i
I
e t
APPENDIX D Response to NRC Telephone Request'for Additional Information This Appendix contains the responses to an NRC request in a telephone conversation on January 3~, 1983 for additional information related to this application for a Special Nuclear License.
o s}
APPENDIX B NRC Telephone for Additional Information 1.
Which position is responsible for fuel and neutron source handling procedures and administrative controls?
The Nuclear Engineering Engineer-Nuclear has overall responsibility for fuel and neutron source handling procedures and administrative controls at Waterford 3.
2.
What are the minimum qualifications for the above position?
The minimum qualifications for the above position are in conformance with ANSI /ANS 3.1-1978 "American National Standard for Selection and Training of Nuclear Power Plant Personnel, "Section 4.4.1 " Reactor Engineering."
In summary, these qualifications are that the person filling this position shall have a Bachelor's Degree in Engineering or the Physical Sciences and four years experience or a graduate degree and three years experience.
j Two of these years shall be nuclear plant experience. This is in accordance with the qualifications outlined in FSAR Table 13.1-3.
3.
Who is responsible for fuel handling training?
LP&L Nuclear Training Department has coordinated vendor training for personnel associated with fuel handling. Training for inspection and receipt procedures is included in technician and fuel inspector training programc. Middle South Services Quality Assurance Department is con-ducting training to qualify a sufficient number of fuel inspectors.
i