ML20028F599

From kanterella
Jump to navigation Jump to search
Contract: Panel...Review of NUREG Prior To...Peer Review Group...Review of Draft Rept Entitled Radionuclide Release Under LWR Specific Accident Conditions, Awarded to Levy, Inc
ML20028F599
Person / Time
Issue date: 01/25/1983
From: Levy S, Rebello J
NRC OFFICE OF ADMINISTRATION (ADM), S. LEVY, INC.
To:
Shared Package
ML20028F598 List:
References
CON-FIN-B-8989, CON-NRC-04-83-104, CON-NRC-4-83-104 NUDOCS 8302020273
Download: ML20028F599 (4)


Text

' q '"4-

  • 1 AND AL D #.OEM 2 6, JULY Ifte 1

Gi Ni e s.

sis nces ADMImmAnON AWARD / CONTRACT flD. r:OC. Lt G. (d ICf t) 8 96.111

". kt OUI 511CN/ PUkCH AS[ 9tOUf $1/FkOJtC1 NO.

4. CtRHfit D ICS N1110 Nit Dif1N5( UNDit DDSA
3. COenR Act (s'so,,. J int.14,17.) NO.

2 tif tC11Yi Diff 4

fiRC'-04 014 JAN c ] 1983 RFPA RES-83-014 S.,1,' " ' ' "' " "' ' '

1. Of!8VIRY 3 155UED BY (ODE
6. ADMINtitletD BY (ODI O NAnON f 06 Ot b11-(if oil,rr sl>an b/wk $)

U.S. fluclear Regulatory Commission Division of Contracts, AR-2223 OTHER (See Washington, DC 20555 i.,ie..;

s. CONTRAC10R CODE l l

FACILJTY CODE l j 9. D'sCOuwt fOn raOurt PAvMENT NAME AND ADDRE55 MR. SOLOMON LEVY (3""' 'im 1999 South Bascom Avenue

<1msty, Slette a rir aos >

Suite 725 Campbell, CA 95008 iD. sU m inv0 Ces t 1,eri,,..i,,,

e,4,,

is,

.r,.of,s> iO ADDRiss sHOwN iN tOCa

{

S t. 5 HIP 10/ MARK FOR CODE l l

12. PAYMENT WILL BE MADE BY CODE l U.S. Nuclear Regulatory Ccmmission U.S. fluclear Regulatory Commission Attention: Michael W. Jankowski Office of Resource Management ll30-SS Division of Accounting and Finance Fyel Behavior Branch,Rechnology, RES Division of Accident Attention: GOV /COM ACCOUNTS

-Washingtorn-DC--20555 U g pgpn g p0555

13. THIS PROCURf MENT WA5 O ADviR'isio. x NiGOriAirD. ru,suA~r 10; 41 U.S.C. 252 (c)( 34
14. s.CCOUNTING AND APPROPR'ATION DATA B&R:

60190201 FIN: B8989 8,596.56 36.

17.

18.

19.

20.

15.

11! M NO.

SUPPilE 5 / 5t avtCf 5 O U A NilIY UNIT UNIT PRICE AMOUNT Panel nember and documentation review of NUREG

$ 8,596.56 prior to and during selected meetings of Peer Review Group for the review of draf t report entitled "Radionuclide Release Under LWR Specific Accident Conditions."

r TOTAL AMOUNTOF CONTRACT s 5 839555-23.

CONTRACTING OFFICER WILL COMPLETE BLOCK 22 OR 26 AS' ARTtM.4BLE 26.

AWARD (Cenir.arier is sof rapses/ fr sign f/>is derament.)

Your oHee

22. @ CONTRAC1CR'5 NEGOTIAf f D AGRE EMENT (Centrasfer is rrysoired de sign snelvd.co *%

this document and vetern cope'es le issuing efet.) Codronos agrees on sof.c.oot;on Number I:s f uen.sh end del. et oil.tems or perform all the seeveses set forth or otherwete odd.tions os thengen mode by yov wh.ek o# 4 oan or thonges oe, set forth in full ihnhf'ed obove end on any tenh'nvat on sheets for the cons deret on ste*ed here.R.

obove, is hereby ottesded on to the esems 1.e'ed chose end on any conhavehen sk*e's l

The e;ghes and obt.got.ons of the g oet.es to th;s sentract shall be tab ect to and gov-This o.oed sens mmeses she conteoct =h.ch se a.sts of the fotfo.ing documees: (e) o l

eened by the folle=ing docume'ds. {o) th.s o=ood/co.*oct, (b) the sol.citet.on, of ony, the Go,etament's sol.citet.on end yow ope, and (b) Na o=oed/conteoct.

No a*J {s) sveh peowisions, re presento%cas, e ert.fico'.ons, and specincot.ons, os oee furthee sor*octuoi document is necesso y ensched oe socorposoted by seIerence he een.

( Aft.athmrsis art listed hert/s.)

23. NAmt Of LONTRACTOR
27. UNITED hAUS Of AME ICA /

SY

/

)

BY (5.gao*u'e of pe***a ov'ho' ired to s gal i)

(5 skel.ir (ce* ec -g O%e,)

24. HAMI AND 11TLE Of SIGNE R [ Type or prigi) 2$. DAI( $tGNE D
28. NAME'Of CON 1a ACT NG OfftCrn f3sp,,i ries)
29. DATE SIGNLD f

8302020273 830125 JOHN E. REBELLO 1/ 7 )/83 PDR CONTR

" 5-

"'ct' n.iD' NRC-04-83-104 PDR

/

HRC-04 014 Page 2 of 4 ARTICLE I - BACKGROUND A peer review will be conducted of NUREG-0956 draft report entitled " Radio-nuclide Release Under LWR Specific Accident Conditions." Tnis review is being conducted b'ased on the collective consensus of the Commission, Executive Director of Operations, and the Advisory Committee on Reactor Safeguards, that the.

reassessment of the LWR source term is one of the highest priority tasks in -the U.S. Nuclear Regulatory Commission.

ARTICLE II - STATEMENT OF WORK

~

The Contractor will participate' as a panel member of a Peer Review Group conducted to review a draft report, NUREG-0956, entitled "Radionuclide Release Under LWR Specific Accident Conditions."

The first peer review meeting of a series of three review meetings, will be conducted on January 25 and 26,1983 at the NRC Headquarters,1717 il Street, ROOM 1046, Washington, DC, and will be chaired hy Melvin Si.lberberg.

The first review will cover VOLUME I, which contains analyses for a PWR iarge dry containment design.

VOLUME II and III, which will provide analyses for BWR Mark I and Mark III and PWR Ice Condenser design, are scheduled for similar peer review meetings to be conducted (tentatively) on March 23 and 24; May 17 and 18,1983, respectively.

Each panel member will provide written comments at the conclusion of each Peer Review Meeting in the form of a written report.

Oral comments will be pro-vided during the meeting as a participant in the review discussions.

Meetings and Travel The Contractor shall be required to attend three Peer Review Meetings of two-days duration in Washington, DC, for a total of 6 days.

Reporting Requirements The Contractor shall perform a preparational review of document prior to each meeting, review time not to exceed 5 days per meeting, for a total of 15 days, and submit a final report upon conclusion' of each meeting, to the Project Officer, Michael W.

JAnkowski, Fuel Behavior Branch,1130S5, Division of Accident Technology, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington, DC 20555.

ARTICLE III - TRAVEL REIMBURSEMENT Travel and subsistence will be reimbursed to the Contractor for actual costs not exceeding the rates specified below:

1.

Travel to Washington, DC reimbursed at a daily rate, not to exceed $75.00 per day.

2.

Personal car mileage allowance at tLe rate of 20 cents per mile.

3.

All common carrier travel reimbursable hereunder shall be via economy class rates when available.

If not available, reimbursement vouchers will be annotated that economy class accommodations were not available.

First-class air travel is not authorized.

NRC-04-83-014 Page 3 of 4 4.

Receipts are required for common carrier transportation, lodging, and miscellaneous items in excess of $15.00.

ARTICLE IV - PERIOD OF PERFORMANCE The period of performance under this contract shall commence on the effective date of the contract and all effort shall be completed 15 days after the date of the last meeting date presently scheduled on f*ay 17-18, 1983.

ARTICLE V - CONSIDERATION In full consideration of the Contractor's performance hereunder, the NRC shall pay the Contractor $30.67 per hour.

Travel and subsistence in accordance with ARTICLE III.

. he. total amount of the contract is not to exceed $ 8,596.56 T

ARTICLE VI - PAYMENT Payment shall be made in accordance with Clause 2 of the General Provisions entitled " Payments" in approximately thirty days after submission of proper and correct invoices or vouchers on.a monthly basis in a form satisfactory to the Contracting Officer; provided; however, that said payment (s) shall not be deemed to prejudice any rights which the Government may have by law or under any other provision af this contract.

ARTICLE VII - PROJECT OFFICER i

Michael W. Jankowski is hereby designated as the Contracting Officer's authorized representative -(hereinafter referred to as Project Officer) for technical aspects of this contract. The Project Officer is not authorized to approve or request any action which results in or could result in an increase in contract ccst; nor terminate or settle any claim or dispute arising under the contract; nor issue any unilateral directive whatsoever.

The Project Officer is responsible for:

monitoring the Contractor's technical progress, including surveillance and 1.

assessment of performance, and recommending to the Contracting Officer changes in requirements; 2.

interpreting the statement of work; 3.

performing technical evaluation as required; performing technical inspections and acceptances required by this contract; and 4.

assisting the Contractor in the resolution of technical problems encountered 5.

during performance.

e NRC-04 014 Page 4 of 4 Within the purview of this authority, the Project Officer is authorized to review all costs requested for reimbursement by the Contractor and submit recommendations for approval, disapproval, or suspension for supplies or services required under this contract.

The Contracting Officer is responsible for directing or negotiating any changes in terms, conditions, or amounts cited in the contract.

For guidance from the Project Officer to the Contractor to be valid, it must:

1.

be consistent with the description of work set forth in the contract; 2.

not constitute new assignment of work or change of the expressed terms, conditions, or specifications incorporated in to this contract; 3.

not constitute a basis for an extension to the period of perforaance or contract delivery schedule; and 4.

not constitute a basis for any increase in the contract price.

ARTICLE VIII - INSPECTION AND ACCEPTANCE Acceptance of the services and final report to be delivered hereunder will be made by the Project Officer.

ARTICLE IX - GENERAL PROVISIONS This contract is subject to the General Provisions entitled " Fixed Price Research dated November 14, 1977, which and Development Contracts Under $10,000.00" incorporates the FPR Changes and Additions and NRC Additions, which is attached hereto and made a part hereof.

e Clause 14 of the General Provisions entitled " Patent Rights - Acquisition by the Government" is deleted in its entirety.

ARTICLE X - KEY PERSONNEL Mr. Solomon Levy is identified as being essential to the work being performed under this contract.

,