Forwards IE Insp Repts 50-277/82-23 & 50-278/82-22 on 821116-18 & 1208.No Noncompliance Noted
ML20028F386
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 01/17/1983
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20028F389 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8302010316
Download: ML20028F386 (2)


See also: IR 05000277/1982023

Text

'

.

i

-

.

.

JAN 171983

s

Docket No. 50-277

License No. DPR-44

50-278

DPR-56

Philadelphia Electric Company

ATTN:

Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

_

Gentlemen:

Subject:

Inspection 50-277/82-23; 50-278/82-22

_

This refers to the special safety inspaction conducted by Mr. D. Johnson of

this office on November 16-18 and December 8, 1982, at Peach Bottom Atomic

Power Station, Delta, Pennsylvania and at the corporate office, Philadelphia,

Pennsylvania, and to the discussions of our findings held by Mr. Johnson with

Mr. M. Cooney and other members of you staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector. No

s

violations were observed.

ho reply to this letter is required. We call your attention, however, to the

radiation shielding review inadequacies identified in the enclosed inspection

report.

The primary purpose of this inspection was to review your staff's

evaluation and corrective actions related to TMI Action Plan Item II.B.2,

Design Review of Plant Shielding, in support of the Nuclear Reactor Regulation

(NRR) staff's evaluation of this item. During our inspection we noted that your

contractor's shielding study assumptions, methodology and dose rate

calculations were acceptable, and that most vital areas were considered. But

i

some vital areas were not addressed in your study.

In addition, your staff's

evaluation was not supported by appropriate documentation of their

identification of potentially vital areas at the Peach Bottom Atomic Power

Station, or of their determination of appropriate types of corrective actions

P.o provide for adequate access to vital areas. With respect to the adequacy

of your submittals, we found that your descriptions of actions taken were in

some cases incomplete, inaccurate, or revised without sufficient

explanation. These concerns have been discussed with Mr. M. Cooney and other

members of your staff. Although we are sharing these problems with you at

this time, we will continue to coordinate our review effort with NRR.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

0FFICIAL RECORD COPY

8302010316 830117

PDR ADOCK 05000277

TEOl

G

PDR

.

.

,

.

Philadelphia Electric Company

2

M 17 E

application to withhold information contained therein within thirty days of

tne date of this letter.

Such application must be consistent with the require-

ments of 2.790(b)(1). The telephone notification of your intent to request

withholding, or any request for an extension of the 10 day period which you

believe necessary, should be made to the Supervisor, Files, Mail and Records,

USNRC Region I, at (215) 337-5223.

Your cooperation with us is appreciated.

Sincerely,

Original Signed By:

Richard W. Starostecki, Director

Division of Project and Resident

Programs

Enclosure: NRC Region I Combined Inspection Report 50-277/82-23; 50-278/82-22

cc w/ enc 1:

W. T. Ullrich, Station Superintendent

Troy B. Conner, Jr. , Esquire (w/o rpt)

Eugene J. Bradley, Esquire (w/o rpt)

Raymond L. Hovis, Esquire (w/o rpt)

Michael J. Scibinico, II, Asst. Attorney General (w/o rpt)

Public Document Room (PDR)

Local

ublic Document Room (PDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Pennsylvania

bcc w/ encl:

Region I Docket Room (w/ concurrences)

Troy B. Conner, Jr. , Esquire

Eugene J. Bradley, Esquire

Raymond L. Hovis, Esquire

Michael J. Scibinico, II, Asst. Attorney General

Senior Support Operations Officer (w/o enc 1)

DPRP Section Chief

NRR, Project Manager

v

&

I40PRp'

e

s

<.

Ar 0Pf_P

RI:D RP

RI:DPRP

Johnson:as

McCabe

Keijni

StriggsT,ec ar

I2/,27/82

tj,Q

\\

9

[i

1

l

0FFICIAL RECORD COPY

. _ .