Final Deficiency Rept Re Sheared Pinion Keys in Limitorque Motor Operators.Initially Reported on 820805.No Safety Evaluation Necessary Since Limitorque Model SB-0-25 Motor Operators Not Used at Facility.Also Reported Per Part 21
ML20028F292
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/24/1983
From: Oprea G
HOUSTON LIGHTING & POWER CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, ST-HL-AE-927, NUDOCS 8301310350
Download: ML20028F292 (3)


Text

l The Light NE E 11ouston Lighting & Power P.O. Box 1700 llouston, Texas 77001 (713)228-9211 January 24, 1983 ST-HL-AE-927 File Number: G12.128 SFN: V-0530 Mr. John T. Collins

%M@MD\V/MN Lir i Regional Administrator, Region IV - h Nuclear Regulatory Commission JAN 2 5123 611 Ryan Plaza Dr., Suite 1000 M kg/

Arlington, Texas 76012 ~ ~ ~ '~~

~

Dear Mr. Collins:

South Texas Project Units 1 & 2 Docket Nos. STN 50-498, STN 50-499 Final Report Concerning Limitorc;e Motor Operators On August 5, 1982, Houston Lighting & Power Company (HL&P), pursuant to 10CFR50.55(e), notified your office of an item regarding sheared pinion keys in Limitorque motor operators. An iaterim report submitted September 3, 1982 advised you that Bechtel was undertaking an evaluation of possible corrective action to address the application of Limitorque motor operators at the South Texas Project (STP). That evaluation has been completed, with the result that it has been determined the suspect model numbers have not been supplied for use on STP. Further details are supplied in the attached final report.

If you shoulo have any questions concerning this item, please contact Mr. Michael E. Powell at (713) 877-3281.

Very truly yours,

/

.W pr r.

Executive Vice President l

l SSR/mg Attachment I

i l

~

l

<Y t

l 8301310350 830124 l 4'DR ADOCK 05000498 I S PDR 1

r .

o llouston Lighting & Power Company cc: G. W. Oprea, Jr. ST-HL-AE-927 J. H. Goldberg File Number: G12.128 J. G. Dewease Page 2 J. D. Parsons D. G. Barker M. R. Wisenburg R. A. Frazar J. W. Williams R. J. Maroni J. E. Geiger H. A. Walker S. M. Dew J. T. Collins (NRC)

H. E. Schierling (NRC)

W. M. Hill, Jr. (NRC)

M. D. Schwarz (Baker & Botts)

R. Gordon Gooch (Baker & Botts)

J. R. Newman (Lowenstein, Newman, Reis, & Axelrad)

STP RMS Director, Office of Inspection & Enforcement Nuclear Regulatory Commission Wcshington, D. C. 20555 G. W. Muench/R. L. Range Charles Bechhoefer, Esquire Central Power & Light Company Chairman, Atomic Safety & Licensing Board P. O. Box 2121 U. S. Nuclear Regulatory Commission Corpus Christi, Texas 78403 Washington, D. C. 20555 H. L. Peterson/G. Pokorny Dr. James C. Lamb, III City of Austin 313 Woodhaven Road P. O. Box 1088 Chapel Hill, North Carolina 27514 Austin, Texas 78767 J. B. Poston/A. vonRosenberg Mr. Ernest E. Hill City Public Service Board Lawrence Livermore Laboratory P. O. Box 1771 University of California San Antonio, Texas 78296 P. O. Box 808, L-46 Livermore, California 94550 Brian E. Berwick, Esquire William S. Jordan, III Assistant Attorney General Harmon & Weiss for the State of Texas 1725 I Street, N. W. .

P. 0. Box 12548 Suite 506 Capitol Station Washington, D. C. 20006 Austin, Texas 78711 Lanny Sinkin Citizens for Equitable Utilities, Inc.

Citizens Concerned About Nuclear Power c/o Ms. Peggy Buchorn 5106 Casa Oro Route 1, Box 1684 San Antonio, Texas 78233 Brazoria, Texas 77422 Jay Gutierrez, Esquire Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Revision Date 12-20-82

f] , .

South Texas Prnject Units 1 & 2 Limitorque Motor. Operators Final Report I. Summary On August 4, 1982, Westinghouse notified HL&P engineering of a potential failure of valves supplied with Limitorque motor operators. The failure could result due to sheared pinion keys.

An investigation of the models of Limitorque motor operators supplied to STP has determined that the suspect model numbers have not been supplied for use on STP.

II. Description of the Deficiency While performing some field modifications and inspections, Westinghouse personnel discovered sheared pinion keys in valves with Limitorque Model SB-0-25 motor operators. These keys are used to secure the pinion gear to the motor shaft which transmits torque to the operator. The Westinghouse Water Reactor Division Safety Review Committee met on August 3, 1982 to consider this item and concluded that the potential for sheared pinion keys in Limitorque motor operators constituted a substantial safety hazard as defined in 10CFR Part 21, potentially applicable to all Westinghouse plants.

HL&P was subsequently notified and reported this matter to the NRC. The identified safety hazard was a failure of one of the subject valves to perform its intended safety function due to failure of the pinion key.

Bechtel subsequently investigated the models of Limitorque motor operators supplied to STP. It has been determined that the suspect model numbers have not been supplied for use on STP. This was confirmed by reviewing vendor documents in Bechtel's possession and contacting valve suppliers who utilize Limitorque motor operators. Furthermore, Limitorque Corporation has responded to a request to address the applicability of this deficiency to model numbers other than those identified. Limitorque Corporation stated that their investigation, prompted by the Westinghouse notification, indicates that the deficiency is an isolated occurrence and is limited to a small number of SB-0 motor pinion keys. We conclude, therefore,-

that no further investigation of the motor operators supplied to STP is warranted.

III. Corrective Action Since the suspect motor operators are not used at STP, no corrective action is necessary.

IV. Safety Analysis In light of the determination that the suspect motor operators are not used at STP, no safety evaluation is necessary.