Text
__,
Dsckst Nos. 50-528/529/530 50,55 (c)
RepoEcCEIVED t
tmc Arizona Public Service Company Po Box 21666. PHOENIX. ARIZONA 85036 g
i January 19, 19 ANPP-22779-G N VIED U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. D. M. Sternberg, Chief Reuctor Projects Branch 1
Subject:
Interim Report - DER 82-81 A 50.55(e) Potentially Reportable Deficiency Relating to R-Class Instruments Were Installed In Lieu of Q-Class In Units #1 and #2 Diesel Generator Buildings File: 83-019-026 D.4.33.2
Reference:
Telephone Conversation between P. Narbut and G. Duckworth on December 22, 1982
Dear Sir:
The NRC was notified of a Potentially Reportable Deficiency in the referenced telephone conversation. At that time, it was estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive investigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by March 15, 1983, at which time a complete report will be submitted.
Very truly yours,
(!LR kW g
E. E. Van Brunt, Jr.
APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/GHD:ske Attachment ec: See Attached Page 2 8301310244 830119 gDRADOCK 05000528 PDR
y.
U. S. Nuclear Regulatory Commincion Attention:
Mr. D. M. Sternberg, Chief ANPP-22779-CHD/BSK January 19, 1983 Page 2 cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nucicar Regulatory Commission Washington, D. C.
20555 T. G. Woods, Jr.
J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum W. E. Ide B. S. Kaplan A. C. Rogers J. Vorees J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111 P. P. Klute Lynne Bernabei, Esq.
Harmon & Weiss 1725 "I" Street, NW Washington, D. C.
20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503
e e+
INTERIM REPORT - DER 82-81 POTENTIAL REPORTABLE DEFICIENCY ARIZONA PUBLIC SERVICE COMPANY (APS)
PVNGS UNITS #1 AND #2 I.
Potential Problem The Waldinger Corporation is the prime HVAC Subcontractor to Bechtel Power Corporation, and in turn purchases instruments from Honeywell. Honeywell employees have notified the Waldinger Corporation of,the following irregularities in the installation of instrumentation in the Units #1 and #2 Diesel Generator Buildings:
a.
Non-Q-Class instruments installed in safety-related locations (four (4) in Unit #1, and five (5) in Unit #2).
b.
Instruments have been found deliberately damaged (bent probes).
These irregularities may indicate that the other instru-mentation provided and installed by Honeywell may not have had all the engineering acceptance criteria identified.
II.
Approacn To and Status Of Proposed Resolution Bechtel Power Corporation is working with the Waldinger Corporation and Honeywell to disposition this item.
III. Projected Completion of Corrective Action and Submittal of the Final Report Evaluation of this condition and submittal of the Final Report is forecast to be completed by March 15, 1983.
<