Final Deficiency Rept DER 82-78 Re Improperly Crimped Termination Lugs in Control Panels for Water Chillers Mfg by Carrier Air Conditioning.Initially Reported on 821217. Connectors Not Meeting Visual Criteria to Be Repaired
ML20028F164
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/17/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22734-GHD, DER-82-78, NUDOCS 8301310197
Download: ML20028F164 (3)


Text

Dockst Nos. 50-528/529/530 50.55 (o) Repgg tmc Arizona Public Service Company l[h3J/,$2l {*{ g.

Po DoX 21666 e PHOENIX. ARI2ONA 85036 January 17, 1983 ANPP-22734-CHD/BSSEGiON V;n U. S. Nuclear Regulatory Consnission Region V Creekside Oaku Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California Attention:

Mr. D. M. Sternberg, Chief Reacto'r Projects Branch 1

Subject:

Final Report - DER 82-78 A 50.55(e) Reportable Condition Relating to Improperly Crimped Termination Lugs in Control Panels for Water Chillers by Carrier Air Conditioning File:

83-029-026 D.4.33.2

Reference:

(A) Telephone Conversation between T. Young and J. Cook on December 17, 1982

Dear Sir:

Attached, is our final written report of the Reportable Deficiency under 10CFR50.55(e), referenced above.

Very truly y 'urs c-(

dQ HCL (_

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects ANPP Project Director EEVBJr/GHD:ske Attachment cc:

See Ar.tached Page 2 j

8301310197 830117 PDR ADOCK 05000528 S

PDR

.o U. S. Nuclear Regulatory Commission Attention:

Mr. D. M. Sternberg, Chief ANPP-22734-Gild /BSK January 17, 1983 Page 2

  • cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bv".um A. C. koger:

B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. llawkinson L. E. Vorderbrueggen G. A. Fiorelli P. P. Klute Lynne Bernabei, Esq.

liarmon 6 Weiss 1725 "I" Street, NW Washington, D. C.

20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503

. ~. _

m _-

i

. -s l

l FINAL REPORT - DER 82-78 DEFICIENCY EVALUATION 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS) i PVNGS UNITS 1, 2 AND 3 1.

Description of Deficiencg j

i During surveillance activity and random inspection of the Unit #2 Control Building Chiller Control Panels 2J-ECB-E02 and 2J-ECA-E03, supplied by Carrier Air Conditioning, it was found that the elec-j trical terminations do not comply with the visual inspection cri-teria for the Thomas & Betts crimp-lug terminations. This cri-teria is established by Thomas & Betts Basic Criteria and Instal-lation Procedurec (TRM-1) dated June, 1978. The visible defects 1

include:

e Terminations exceed 1/16" of conductor extending j

beyond the barrel of the lug.

e Conductor not exposed from barrel of the lug.

f e Paper not removed from conductor prior to crimping j

barrel of the lug.

e Lugs were reversed, preventing visual inspection.

II.

Analysis of Safety Implications This condition is evaluated as Reportable.

If inadequately crimped lugs were left uncorrected, potential open or short circuits could jeopardize functioning of this safety-related equipment.

III. Corrective Action 3

l All Class 1E terminations utilizing crimp-type lugs in the subject equipment shall be inspected to visual criteria which provide that i

the conductor shall be approximately flush with or protrude through 1

the barrel approximately 1/16". Any connectors which do not meet j

this criteria shall be repaired, as applicable, following the termi-nation practices established in Bechtel Construction Specification j

No. 13-EM-306. This condition will be corrected via Design Change Packages 10M-EC-024, 20M-EC-024 and 30M-EC-024.

In addition to reportability under 10CFR50.55(e), PVNGS Project considers the Deficiency to be Reportable by the supplier under the requirements of 10CFR Part 21. This report satisfies the reporting

)

requirements specified under 10CFR21-21(b)(3), with the exception of Sub-Part (vi), which requires the number and location (customers and/or facilities) of other possibly defective equipment. A copy I

of this report will be transmitted to Carrier Air Conditioning requesting their review for reporting under 10CFR Part 21.