Interim Rept of Deficiency DER 82-56 Re Scaledown of Design of Condensate Storage Tank W/O New Calculations for Seismic Response.Initially Reported on 821015.Final Rept Will Be Submitted by 830211
ML20028F158
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 01/11/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22696-GHD, DER-82-56, NUDOCS 8301310194
Download: ML20028F158 (2)


Text

t Docket Nos._ 50-528/529/530

[# 50.55 (e) Report pgggg HRC Arizona Public Service Compag PO. 804 21666 . PHOENIX. AR6 ZONA 85036 Il 2 i P!4 12: I,7 January 11, 1983 ANPP-22696-dlGTfpS,Kj g U. S. Nuclear Regulatory Cornmission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 -

Walnut Creek, California 94596-5368 Attention: Mr. D. M. Sternberg, Chief _ ,

Reactor Projects Branch 1

Subject:

Time Extension for Report - DER 82.56 A 50.55(e) Potentially Reportable Deficiency Relating to Condensate Storage Tank Design Was Scaled-Down Without New Calculations for Seismic Response File: 83-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on October 15, 1982 (B) ANPP-22179, dated November 1,1982 (Interim Report)

Dear Sir:

The NRC was notified of a Potentially Reportable Deficiency in Reference (A), and an Interim Report was transmitted by Reference (B).

At that time, it was estimated that a Final Report would be available by January 11, 1983.

Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by February 11, 1983, when a complete Report wD1 ha submitted.

There is no new inft"A tio or change to the Interim Report at this time.

Very truly yo rs I Q C __

CC CLLL %LL E. E. Van Brunt, Jr.

APS Vice President do.' ear Projects ANPP Project Director EEVBJr/GHD:ske cc: See Attached Page 2 O O S

-S = +4 -A- - - m e a t

U. S. Nuclear Regulatory Commission i Attention: Mr. D. M. Sternberg, Chief i

ANPP-22696-CHD/BSK January 11, 1983 Page 2 s

cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum A. C. Rogers B. S. Kaplan W. E. Ide J. Vorces J. A. Brand A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli l P. P. Klute Lynne Bernabei, Esq.

Harmon & Weiss 1725 "I" Street, NW

, Washington, D. C. 20006 4

R. L. Greenfield i Assistant Attorney General Bataan Memorial Building i Santa Fe, New Mexico 87503 e

l l

1 h

_ _. , _ -