ML20028F112

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/82-30 on 821220-23.No Noncompliance Noted
ML20028F112
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 01/11/1983
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20028F113 List:
References
NUDOCS 8301310161
Download: ML20028F112 (2)


See also: IR 05000397/1982030

Text

!

.

J AN 111803

Docket No. 50-397

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99352

Attention: Dr. R. G. Matlock

Program Director, WNP-2

Gentlemen:

Subject: liRC Inspection - WNP-2

This refer: to the routine inspection conducted by Messrs. G. P. Yuhas

and C. I. Sherman of this office on December 20-23, 1982 of activities

authorized by NRC Construction Permit tio. CPPR-93, and to the discussion

of our findings held by Mr. Yuhas with Mr. D. Mazur and other members of

your staff at conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information contained

therein within thirty days of the date of this letter. Such application

must be consistent with the requirements of 2.790(b)(1).

ChoN38gjf7

l

f&o(

,,

(

13).. .

..m.m.g.. ..

gad . ...}H

R

wnen

.

'

' ' '

'

"

G.duha3.dh,,,

C. Sherpa,n , ,

F.,Wenslawski

k

sununu o

it.a..i.8a

.;i.w.i.as.. . . it.y..ies...

. ii.g?.8i.

_-

-

-

--

-

-

- -

- -

-,

_ _ _

_ __

_

nnc ronu m oo.so3 Nncu mo

OFFICIAL RECORD COPY

usom i,,i-m+o

j

_ _ _ _

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ .

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ,

!

t

9

'

g,

Washington Public Power Supply System

-2-

JAN 111983

Should you have any questions concerning this inspection, we will be

glad to discuss them with you. ,

i

'

Sincerely,

Griemal sign.:a e

i

H. E pg

'

H. E. Book, Chief

Radiological Safety Branch

'

Enclosure:

Inspection Report

.

No. 50-397/82-30

,

cc w/o enc 1:

'

R. B. Glasscock

'

C. S. Carlisle

G. C. Sorensen

]

.

bcc:

RSB/ Document Control Desk (RIDS)

-

Distributed by RV:

i

RHE (w/o enc)

State of Washington

Resident Inspector

1

4

I

9

'

o

J