Forwards IE Insp Repts 50-498/82-19 & 50-499/82-19 on 821206-17.No Noncompliance Noted
ML20028E739
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 01/10/1983
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Oprea G
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20028E740 List:
References
NUDOCS 8301280162
Download: ML20028E739 (2)


See also: IR 05000498/1982019

Text

.

,

.

.

JAN 101983

Dockets:

50-498/82-19

50-499/82-19

Houston Lighting and Power Company

ATTN:

G. W. Oprea, Jr.

Executive Vice President

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Mr. J. R. Boardman and other

members of our staff during the period of December 6-17, 1982, of activities

authorized by NRC Construction Permits CPPR-128 and 129 for the South Texas

Project, Units 1 and 2, and to the discussion of our findings with Mr. D. R.

Keating and other members of your staff at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of the inspection, no violations or deviations were

identified.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter, and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the

requirements of 2.790(b)(1).

RPS-Bf

RPS-B /

Y 31

JGagl(iado

DRRP&

RIV

__

JBoardman/dsm WCr ssman

GM sen

111ns

~ '

[

1/1/83

1/ /83

1/ /83

1/ ) */p

1/ 0/83

8301200162 830110

PDR ADOCK 05000498

G

PDR

. _

_

_

. . _

_

.

.

.

.

A

Houston Lighting and Power

2

JAN 1019L3

Company

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

    • Original SlSeed bp

G. L. PAADsEN

G. L. Madsen, Chief

Reactor Project Branch 1

Enclosure:

Appendix - NRC Inspection Report 50-498/82-19

50-499/82-19

i

bec to DMB (IE01)

bec distrib. by RIV:

BC

PM

RPB2

Resident Inspector

AE00

ELD

TPB

Section Chief

IE FILE

NRR/DHFS/0LB

MIS SYSTEM

D. S6;ia, NRR

NRR/OSI/RAB

RES

RIV File

W. Hubacek

LPDR

NRC POR

RA

J. Boardman

NSIC

NTIS

C. Wisner

A. Haycraft

TX DEPT. OF HEALTH RESOURCES

l

.