CORSURIBIS Power c
COmpBRY
- """'T**"'
and Cassencres General offices: 1945 West Parnell Road, Jackson, MI 49201 * (517) 788 0453 December 14, 1982 Mr J G Keppler, Regional Administrator US Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, IL 60137 MIDLAND NUCLEAR C0 GENERATION PLANT -
INSPECTION REPORT NO 50-329/82-18, AND 50-330/82-18 FILE:
0.4.2 SERIAL
19117
Reference:
(1) R F Warnick letter to J W Cook, dated September 22, 1982, Inspection Report No 50-329/82-18 and 50-330/82-18 (2) J W Cook letter to J G Keppler, Serial 19087, dated November 5, 1982 Reference 1 transmitted Inspection Report 82-18 which contained four items of noncompliance.
Reference 2, which was in response to Reference 1, committed to providing additional information to two of the items; these being the items on separation criteria and slope layback.
The following are additionci steps we plan to implement to assure meeting the FSAR for separation criteria.
Bechtel Project Engineering issued DCN #163, dated November 24, 1982 a.
against E-42 for installation of separation barriers for cable tray, conduit, and airlined cable.
Field Engineering has drafted a procedure on the " Installation of b.
Separation Barriers" (FIE-4.200). A final procedure is anticipated by December 31, 1982.
The procedure will include a walkdown by Field Engineering to identify areas in the plant where separation barriers are needed. The appropriate method of documentation of identified areas is under evaluation.
bechtel Quality Control will verify the installation of the reparation c.
This PQCI will be barriers by a Project Quality Control Instruction.
written following publication of "b" above, The above will be implemented to support the reinspection effort of the d.
plant's Construction Completion Program (CCP) presented to your staff December 2, 1982.
8301210268 830118 DEC 17 082 OC1282-0014A-MP01 gDRADOCK05000 D
l 2
Serial 19117 Item 3 in Reference 2 left open the engineering disposition of the as-built north-south slope layback, north of the turbine building, for the auxiliary A design change will be processed to building underpinning excavation.
l clarify the slope requirement of 1 vertical to lh horizontal, and the s ope Rework of the present grade will be reworked to meet this requirement.
required to be (overburden) to meet the final plant design grade of 634 is not accomplished at this time.
Consumers Power Company By James W Cook Sworn and subscribed to before me on this 1 th day of December,1982.
s $ 1-r m.s n <
<vN'otary Public, Jackson County, Mich
'M f, /f / /
My commission expires _
6'
/
JWC/WRB/JKM/lr CC RWarnick, NRC Region III UDShafer, NRC Region III RNGardner, NRC Region III RJCook, NRC Resident Inspector, Midland Site RBLandsman, NRC Region III BLBurgess, NRC Region III OC1282-0014A-MP01
- _- _