r*
~
. ~, -
LONG ISLAND LIGHTING COMPANY gg awzemmw SHOREHAM NUCLEAR POWER STATION P.O. BOX 618, NORTH COUNTRY ROAD e WADING RIVER, N.Y.11792 January 17, 1983 SNRC-820 Mr. Harold R.
Denton, Director Office of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 Safety Parameter Display System Shoreham Nuclear Power Station - Unit 1 Docket No. 50-322 Reference (1) : Generic Letter No. 82-33, Supplement 1 to NUREG-0737 - Requirements for Emergency Response Capability, dated 12/17/82
Dear Mr. Denton:
On November 19, 1982, a presentation was made to your staff by representatives of LILCO regarding LILCO's plans for implementation of the Phase II Safety Parameter Display System (SPDS).
As explained during this presentation, the Phase II System has been designed to be in compliance with NUREG-0696, " Functional Criteria for Emergency Response Facilities."
Despite an accel-erated effort, delays with equipment delivery and the require-ment for additional input points for the Phase II SPDS dictated a need to reevaluate the originally scheduled April 1983 im-plementation date.
It was decided that, in order to facilitate the completion of the Phase II SPDS in a manner compatible with the existing preoperational test, fuel load and startup test schedules, design modifications were required to allow the orderly implementation of the Phase II SPDS without sacrificing the operational capability of the Phase I SPDS.
These design modifications have been initiated and are scheduled to be com-pleted prior to fuel load.
The Phase I SPDS, utilizing an enhanced plant process computer data base, will be functional at fuel load and will be maintained in a functional condition thereafter until the Phase II SPPS is declared operational.
OOI 8301210177 830117 PDR ADOCK 05000322 PDR p
(-
January 17, 1983 Mr. Denton Page Two LILCO believes that: the: P an outlined herein meets NRC criteria j
l and represents a cost-effective program for implementation.of j
the Phase II SPDS.
This was confirmed by the NRC Staff in attendance at the November presentation. -LILCO is, therefore, following this? course of action.
An integrated schedule for Phase II SPDS~ implementation is being developed and will be submitted to the NRC by April 15, 1983 as requested by Reference -(l).
Should you have any questions, please contact this office.
Very truly yours,
'V 44 J.
L.
Smith Manager, Special Projects Shoreham Nuclear Power Station RWG:jm cc: