ML20028E224

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Dec 1982
ML20028E224
Person / Time
Site: Rancho Seco
Issue date: 01/14/1983
From: Reinaldo Rodriguez
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20028E225 List:
References
RJR-83-14, NUDOCS 8301210088
Download: ML20028E224 (1)


Text

,e'g (L ISMUD v

SACRAMENTO MUNICIPA1. UTILITY DISTRICT O 6201 S Street, Box 15830, Sacramento, California 95813; (916) 452-3211 RJR 83-14 January 14,1983 DIRECTOR OFFICE OF INSPECTION AND ENFORCEMENT U S NUCLEAR REGULATORY COMMISSION WASHINGTON DC 20555 OPERATING PLANT STATUS REPORT DOCKET NO. 50-312 Enclosed is the December 1982 Operating Plant Status Report for Rancho Seco Unit 1.

Included in this report, in accordance with Technical Specifications 4.17.5b, are the results of a Steam er t r tube inspection (Attachment A).

N R. J. R riguez Manager, Nucleae perations Enclosure cc:

ISE Washington (9)

Region V MIPC (2)

INP0 0$000 ll1 AN ELECTRIC SYSTEM SERVING MORE THAN 600.000 tN THE HEART OF C A L I F O R iv i A