Proposed Tech Specs 3/4.6 Re Containment Sys,Extending Cold Shutdown Period from 30 H to 96 H on one-time Basis
ML20028E198
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 01/14/1983
From:
ALABAMA POWER CO.
To:
Shared Package
ML20028E194 List:
References
NUDOCS 8301210067
Download: ML20028E198 (1)


Text

--

... +

(

3/4.6 CONTAINMENT SYSTEMS 3/4.6.1 PRIMARY CONTAINMENT CONTAINMENT INTEGRITY LIMITING CONDITION FOR OPERATION 3.6.1.1 Primary CONTAINMENT INTEGRITY shall be maintained.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

Without primary CONTAINMENT INTEGRITY, restore CONTAINMENT INTEGRITY within one hour or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTOOWN within the following )( hours.

%O SURVEILLANCE REQUIREMENTS

[

4.6.1.1 Primary CONTAINMENT INTEGRITY shall be demonstrated:

a.

At least once per 31 days by verifying that all penetraticos* not capable of being closed by OPERABLE containment automatic i slation valves and required to be closed during accident conditions are closed by valves, blind flanges, or deactivated automatic valves secured in their positions, except as provided in Table 3.6-1 of Specification 3.6.3.1.

b.

By verifying that each containment air lock is OPERABLE per Specification 3.6.1.3.

c.

After each closing of each penetration subject to Type B testing, if opened following a Type A or B test, by leak rate testing the seal with gas at P 48 psig) and verifying that when the measured leakage rate for t$e(se seals is added to the leakage rates deter-mined pursuant to Specification 4.6.1.2.d for all other Type B and C penetrations, the combined leakage rate is less than or equal to 0.60 L,.

"Except valves, blind flanges, deactivated automatic valves and the equipment hatch which are located inside the containment and are locked, sealed or otherwise secured in the closed position.

These penetrations shall be verified closed during each COLD SHUTDOWN except that such verification need not be performed more often than once per 92 days.

The blind flange on the I

fuel transfer canal flange shall be verified closed after eact} draining of the canal.

MM Ontdshe, ook chwe c)ttn M g W ou,3 h r O e. b e re k ou FARLEY-UNIT 1 C

5 3/e 6-1 AMENDMENT NO. 6 8301210067 830114 PDR ADOCK 05000348 P

PDR