ML20028D655

From kanterella
Jump to navigation Jump to search
Notice of Violation from Insp on 820903
ML20028D655
Person / Time
Site: Salem PSEG icon.png
Issue date: 01/07/1983
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20028D640 List:
References
50-272-82-28, NUDOCS 8301190340
Download: ML20028D655 (1)


Text

. _ -

n l

l APPENDIX A NOTICE OF VIOLATION Public Service Electric and Gas Company Docket No.

50-272 Newark, New Jersey License No. DPR-70 As a result of the inspection conducted on September 3, 1982, and in accordance with the NRC Enforcement Policy, 10 CFR 2, Appendix C, the following violation was identified:

Technical Specification 6.8, " Procedures" requires that written procedures be established, implemented and maintained for activities specified in Appendix "A" of Regulatory Guide 1.33, November 1972.

Procedure PD-3.8.016, Revision 4, Gaseous Radwaste to Release Calculations established in accord-ance with the specifications of Regulatory Guide 1.33, Appendix "A", Sec-tion G, " Procedures for Control of Radioactivity", requires in Sections 3 through 5 that gaseous activity be determined utilizing the IR16 vent monitoring instrument.

Contrary to the above, since the revision of PD-3.8.016 on July 31, 1981, the specifications of Section 3 through 5 regarding the use of the IR16 gaseous effluent monitor were not followed for determining gaseous activity release estimates.

Rather a technique involting grab sampling exclusive of the IR16 instrument, which is not discussed in the procedure, had been utilized.

This is a Severity Level IV violation (Supplement IV).

Pursuant to the provisions of 10 CFR 2.201, the Public Service Electric and Gas Company is hereby required to submit to this office within thirty days of the date of the letter that transmits this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending this response time.

i 0FFICIAL RECORD COPY 8301190340 830107 PDR ADOCK 05000272 Q