ML20028D295

From kanterella
Jump to navigation Jump to search
Forwards LERs 82-157/03L-0 & 82-004/03L-0.Detailed Event Analysis Submitted
Date released: 02/11/2020 Download: ML20028D295


LER 82-004/03L-0:on 821124,samples from Control Room Emergency Air Cleanup Sys Train a Charcoal Absorber Failed to Satisfy Methyl Iodine Removal Capability.Caused by Activated Charcoal Degradation.Charcoal Replaced
ML20028D304
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/23/1982
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML20028D304 (1)
LER 82-157/03L-0:on 821124,samples from Control Room Emergency Air Cleanup Sys Train a Charcoal Absorber Failed to Satisfy Methyl Iodine Removal Capability.Caused by Activated Charcoal Degradation.Charcoal Replaced
ML20028D301
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/23/1982
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML20028D301 (1)
Forwards LERs 82-157/03L-0 & 82-004/03L-0.Detailed Event Analysis Submitted
ML20028D294
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 12/23/1982
From: Ray H
SOUTHERN CALIFORNIA EDISON CO.
To: ENGELKEN R H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
Download: ML20028D294 (2)