ML20028D217

From kanterella
Jump to navigation Jump to search
Forwards Updated LER 82-136/03L-1
Date released: 02/11/2020 Download: ML20028D217


Updated LER 82-136/03L-1:on 821022,indicator 1-CAC-LI-2601-1 Showed Level of -27 Inches,Indicator 1-CAC-LI-2601-3 Showed Level of -27.5 Inches & Indicator 1-CAC-LR-2602 Showed Level of -29 Inches.Caused by Change in Trickle Flow
ML20028D228
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/30/1982
From: Pastva M
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20028D228 (2)
Forwards Updated LER 82-136/03L-1
ML20028D216
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 12/30/1982
From: Dietz C
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20028D216 (1)