ML20028D175

From kanterella
Jump to navigation Jump to search
Forwards LER 82-019/03L-0.Detailed Event Analysis Encl
Date released: 02/11/2020 Download: ML20028D175


LER 82-019/03L-0:on 821207,valve 1HP-25 Failed to Open Remotely During Operational Valve Function Test.Caused by Component Failure.Valve Manually Cracked Open,Cycled & Stroke Tested
ML20028D177
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/06/1983
From: Petty J
DUKE POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20028D177 (1)
Forwards LER 82-019/03L-0.Detailed Event Analysis Encl
ML20028D174
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 01/06/1983
From: Tucker H
DUKE POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML20028D174 (2)