ML20028D074
| ML20028D074 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 12/28/1982 |
| From: | Little W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20028D075 | List: |
| References | |
| NUDOCS 8301170039 | |
| Download: ML20028D074 (2) | |
See also: IR 05000254/1982019
Text
_ _ _ _ . _ _ . _
_
. _ . ._ _
. _ _ .
_ _ _ _
__
_ _ . . _ _ _ _ _
.
.._ _ ____ _
__
i
.
.
!
!
l
CEC 3 81982
1
1
j
Docket No. 50-254
l
Docket No. 50-265
i
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
'
Chicago, IL 60690
2
Gentlemen:
1
This refers to the special safety inspection conducted by Messrs.
j
D. H. Danielson and K. D. Vard of this office on September 22, 23, October 7,
8, 19, 20, 21, 30, November 8, and December 8,
1982, and a demonstration of
ultrasonic methodology at the Battelle Memorial Institute, Columbus, Ohio, on
October 7 and 8, 1982, of activities at the Quad-Cities Station, Units 1 and 2,
authorized by NRC Operating Licenses No. DPR-29 and No. DPR-30, and to the
discussion of our findings with Mr. L. Gerver at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during
i
the inspection. Within these areas, the inspection consisted of a selective
'
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
1
'
that you (or your contractors) believe to be exempt frca disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
'
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
8301170039 821228
PDR ADOCK 05000254
Q
/ dot
. _ . .
._
_ _
_
__
_ _ __.
_-
_ . _ _
_ _ . _ _ _
.
a
.
.
DEC 2 B 1982
Commonwealth Edison Company
2
please notify this office promptly so that a new due date may be estab-
i
1
11shed. Consistent with Section 2.790(b)(1), any such application must
i
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
4
claim that the information should be withheld from public disclosure.
-
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
j
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
!
inspection report will be placed in the Public Document Room.
!
We will gladly discuss any questions you have concerning this inspection.
!
Sincerely,
-
'
" Original cirr.2d by 17. S. Littic"
W. S. Little, Chief
l
Engineering Programs Branch
!
4
Enclosure:
Inspection Reports
No. 50-254/82-19(DETP) and
No. 50-265/82-22(DETP)
'
cc w/ enc 1:
l
Louis 0. De1 George, Director
'
of Nuclear Licensing
N. Kalivianakis, Plant
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, Rill
Karen Borgstadt, Office of
Assistant Attorney General
RIII
RIII
RIII
RIi k
lT)Wf
Da&ff
ff,6)
h
t1e\\
nielson
Walker
L
t Ward /sv
12/21/82
jf3}f],
jpjg?-
f
i
I
{
t
,