Confirms Conversation Re 830120 Meeting to Discuss Status of Pressurized Thermal Shock.Detailed Agenda Encl
ML20028D064
Person / Time
Site: Maine Yankee
Issue date: 01/03/1983
From: Clark R
Office of Nuclear Reactor Regulation
To: Garrity J
Maine Yankee
References
REF-GTECI-A-49, REF-GTECI-RV, TASK-A-49, TASK-OR NUDOCS 8301140470
Download: ML20028D064 (3)


Text

-

r D C 5 #13-0 @

DISTRIBUTION

,A6'cket File JAN 3g Local PDR ORB #3 Rdg 0.Eisenhut Docket No. 50-309 JHeltemes RAClark PKreutzer (3)

OELD Hr. John H. Garrity, Senior Director NSIC Nuclear Engineering and Licensin9 E.L. Jordan Maine Yankee Atomic Power Company J.M. Taylor (1) 83 Edison Drive ACRS (10)

Augusta, Maine 04336 KHeitner Gray File

Dear Mr. John Garrity:

SUBJECT:

MEETING PRESSURIZED THERMAL SHOCK STATUS - MAINE YAMKEE.

I' This letter is to confirm our conversation Mr. Nichols of.your.

staff on a meeting to discuss the status of pressurizen thermal shock at Maine Yankee.

The key items we would like you to report on are as follows:

Current Status of the Plant j

i Flux Reduction Options Considered Alternatives to Flux Reduction for Delaying or Avoiding Reaching the Screening Criteria A more detailed adgenda is attached.

Our proposed meeting date is January 20, 1983. Please contact, the Maine Yankee Project Manager, Kenneth L. Heitner within 3 working days of recieving this letter to make suitable meeting arrangements.

A written response to this letter is not required. This request for infor-mation affects fewer than ten respondents, and therefore OMB clearance is not required under P. L.96-511.

f Sincerely, j

Original signed by Robert A. Clark i

Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing

Attachment:

As stated t

l cc: R. Woods G. Vissing

.T..I.' ~...E.I......OR,B#3g,D,L,%}h,R.SD,;p,(,,,,,,0,,, 4,: D,1,,,,,,,,

omcm O-

'li38U4o47oesotoa PDR AD0CK O5000309

. I?bj.Cl.%E......

l.YlB2.........1.?h.l.0?.......

P PDR sac ronu sia no em r.ncu eno OFFiClAL RECORD COPY usceo.1981-33}9C0

,\\

Maine Yankee Atomic Power Company cc:

E. W. Thurlow. President Mr. Robert H. Groce Maine Yankee Atomic Power Company Senior Engineer - Licensing Edison Drive Maine Yankee Atomic Power Company Augusta, Maine 04336 1671 Worcester Road Framingham, Massachusetts 01701 Mr. Donald E. Vandenburgh Vice President - Engineering U. S. Environmental Protection Agency Yankee Atomic Electric Company Region I Office 1671 Worcester Road ATTN: Reg. Radiation Representative Framingham, Massachusetts 01701 JFK Federal Building Boston, Massachusetts 02203 John A. Ritsher, Esq.

Ropes & Gray 225 Franklin Street Boston, Massachusetts 02110 State Planning Officer Executive Department 189 State Street Augusta, Maine 04330 Mr. E. C. Wood, Plant Manager Maine Yankee Atomic Power Company P. O. Box 3270 Wiscasset Maine 04578 Regional Administrator U. S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 First Selectman of Wiscasset Municipal Building V. S. Route 1 Wiscasset, Maine 04578 Mr. Paul Swetland Resident Inspector c/o U. S. Nuclear Regulatory Commission P. O. Box E Wiscasset, Maine 04578 Mr. Charles B. Brinkman Manager - Washington Nuclear Operations Combustion Engineering, Inc.

4853 Cordell Avenue, Suite A-1 Bethesda., Maryland 20014

- m -

o m

.- /4 ENCLOSURE

AGENDA FOR PTS MEETING *S WITH LICENSEES WHICH ARE CONSIDERED TO NEED A FLUX REDUCTION PROGRAM BY A FACTOR OF 2 OR MORE IN ORDER NOT TO REACH THE SCREENING CRITERIA BY END OF LIFE o Current Status of Plant

- fluence

- RTNDT

- RT rate of increase NDT

- date when will exceed screening RT NDT e Flux Reduction Option Considered

, description

- resulting flux reduction

- advantages and disadvantages, particularly power limits

- discussion of limit that causes power limit t..

- hot channel factor

- DNBR

- other

- assessment of desirability (from overall plant safety viewpoint) of relaxation of that limit.

e Alternatives to Flux Reduction for Delaying or Avoiding Reaching the Screening Criteria

- archival materials research

- other e Other Aspects of PTS program (should be a minor portion of meeting, or Thrust of This Meeting is Flux Reduction or Alternatives to Avoid or Delay Reaching Screening Criterion) s.

a n

O.

m m

m

  • ss