Tt nt f blclcy9Mlhg ED.'l Vlq Docket No.'99900762/82-01
-Nuc1 ear Energy Services,1Inc.
NES Division.
ATTN:
Mr. W. J. Manion President 1000 Shelter Rock Road Danbury,-CT 06810 Gentlemen:
This refers to the QA program inspection conducted by Mr.~R."E. Oller of this' office on October 20-21, 1982, of your-facility at Danbury,' Connecticut, and to the discussions of our findings with you and memberstof'your staff at
~
the conclusion of the inspection.
This inspection was made to confirm that in the areas inspe'cted your QA' program is being effectively implemented.
The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being achieved; nor to assure that a specific product, component, or service provided by you to your customers is.of acceptable quality.' As you know, the NRC requires each of its. licensees to assume full responsibility for the quality of specific products, components, or services procured from'others.
You should, therefore, not conclude that the NRC's inspection exempts you from.
inspections by an NRC licensee or his agents, nor from taking effective corrective action in response to their findings.
Areas examined during-the inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an-examination of procedures and representative records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, we found no instance where you failed to meet NRC requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within 10 days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days RIV CI:R& CPS SC:R& CPS BC:VP D:
R:
V RE011er/jkh IBarnes UPotapovs RL rigart dT 1 lins 11/0/82 11AT/82 11/d/82 11/gv/82 11 g82 h
S4 V
e 8301140392 821126 PDR GA999 EECNESI
- ( 99900762 PDR
f H
v Nuclear Energy Services, Inc.
' 2-from the date of this letter:a written application to this office to withhold such information.
If your receipt of this -letter has' been delayed such that less.than 7 days are available for your review ~, please notify this office promptly so that a new due date may be established.
Consistent with Section 2.790(b)(1),-any such application must_be accompanied byfan affidavit executed by the owner _ of the infors!ation which identifies the document or part
~
sought to be withheld, and which contains a full statement of the reasons on the basis which it is :laimed that the information should be withheld from public disclosure. Tl:s section further requires.the statementLto address with
. specificity the consir ^ations listed in 10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated as far.as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above', the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
~ discuss them with you.
Sincerely, 4
Uldis Potapovs, Chief
~
Vendor Program Branch
[
Enclosures:
1.
Appendix A - Inspection Report No. 99900762/82-01--
2.
Appendix B - Inspection Data Sheets (6 pages) bec:
IE FILES AE00 QA8 NRC:PDR Regional Administrators I, II, III, IV, and V EHJohnson, RIV i
RLBangart ASME NBB&PVI i.