Interim Deficiency Rept DER 82-53 Re Failure of Joy Fan Blade,Causing 2-inch Penetration in Containment Liner Plate. Complete Rept Will Be Submitted by 830225
ML20028C993
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/22/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-2285-GHD-B, DER-82-53, NUDOCS 8301140382
Download: ML20028C993 (2)


Text

-r m

Dock :t' No(50- 528/52O5'37

~

. b" 50.55 (i Riport

~

~

IITD' Arizona Public Service Company /gy

[ ] OI12:

- P.O. box 21666. PHOENIX. ARIZONA 85036 Jg December 22,,a ANPP-22585-Gi!D

43 U..S. Nuclear Regulatory Commission Region V-Creekside Oaks Office Park 1450 Maria Lane - Suite 210-Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension For Report - DER 82-53 A 50.55(e) Potentially Reportable Deficiency Relating to Failure Of Joy Fan Blade Caused 2-Inch Penetration Of ' Unit I Containment Liner Plate File: 82-019-026 D.4.33.2-

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on September 24, 1982 (B) ANPP-22092 dated October 25, 1982 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by December 22, 1982.

Due to the extensive evaluation required, it is now expected that this information will be finalized by February 25, 1983, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours, 6%

Ng' E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVBJr/ Gild:db cc: See Attached Page 2 y

0 DR a

-3 1

U. S. Nuclear Regulatory Commission December 22', 1982

~

Attention:

Mr. D. M. Sternberg, Chief

~ ANPP-22585-GHD/BSK LPage.2-cc: Richard DeYoung, Director Office of Inspection and Enforcement EU.-S. Nuclear Regulatory Commission.

Washington, D. C. 20555

.T. G. Woods, Jr.

J.'A. Roedel D. B. Fasnacht G. C. Andognini J. R. Dynum A. C. Rogers B. S. Kaplan.

W. E.'Ide J. Vorees J. A. Brand A. C.-Gehr W. J. Stubblefield W. G. Bingham ~

R..L. Patterson R. W. Welcher R. M. Grant D. R. Haw'kinson L. E. Vorderbrueggen-G. A. Fiorelli P. P. Klute Lynne Bernabei, Esq.

Harmon & Weiss 1725 "I" Street, NW Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 l