Informs That Final Deficiency Rept DER 82-50 Re non-seismically Qualified Flexible Conduit Couplings Between Auxiliary & Control Bldgs Expected to Be Complete by 830422. Initially Reported on 820910 & 821008
ML20028C934
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 12/28/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, DER-82-50, NUDOCS 8301140323
Download: ML20028C934 (2)


Text

1 Docket Nos. 50-528/529/530 n

  1. Z N' '

50.55(g rt Arizona Public Service Company. ' gg g _h g P O. BOX 21666. PHOENIX, ARIZONA 85036 December 28, 1

-DQ ANPP-22612-GHD B U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:

Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Time Extension For Report - DER 82-50 A 50.55(e) Potentially Reportable Deficiency Relating to Flexible Conduit Couplings Between Unit 1 Auxiliary and Control Buildings May Be Damaged If Seismic Event Exceeds 3/4-inch Movement File: 82-019-026 D.4.33.2

Reference:

(A) Telephone Conversation between J. Eckhardt and G. Duckworth on September 10, 1982 (B) ANPP-21974 dated October 8, 1982 (Interim Report)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Reference (A), and an Interim Report was transmitted by Reference (B). At that time, it was estimated that a Final Report would be available by December 30, 1982.

Due to the extensive evaluation required, it is now expected that this information will be finalized by April 22, 1983, when a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly yours,

. 64 h*1 g

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects Management ANPP Project Director EEVRJr/ Gild:db

[

cc: See Attached Page 2 B301140323 821228 3

U PDR ADOCK 05000528 S

PDR

~

i n

.o

2 s

b-.,.

. * * ~

m l

1U. S. Nuclear' Regulatory Commission December 28, 1982._

Attention:' Mr. D. M. Sternberg, Chief ANPP-22612-GHD/BSK:

l

.Page 2-

~

.cc:. Richard DeYoung, Director Office of Inspection and Enforcement U.-S. Nuclear Regulatory Commission Washington, D. C. 20555-

~

T. G. Woods, Jr.

J. A. Roedel D. B. Fasnacht G. C. Andognini J. R. Bynum A. C. Rogers f

LB. S. Kaplan W. E. Ide J. Vorees J. A. Brand

'A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher

- R.11. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiore111-P. P. Klute Lynne Bernabei, Esq.

Ilarmon & Weiss 1725 "1" Street, NW Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503