Final Deficiency Rept DER 82-74 Re Potential Undersize/Loose Adjustment Bolts to GE Protective Relays.Initially Reported on 821124.Deficiency Determined Not Reportable Under 10CFR50.55e
ML20028C929
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 12/23/1982
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
10CFR-050.55E, 10CFR-50.55E, ANPP-22587-GHD, DER-82-74, NUDOCS 8301140319
Download: ML20028C929 (2)


Text

q~.

DoSk t~No. 50-528/529/530

.y j

~

50. 55 (0) ; Rcport -

fiforng F-

"'T

(

Arizona Public Service Company fs eo, oox rwe. enoENIX. ARitoNA 8M M N N ~ 5 fff g December 23, 1982 7-GIID/BSK ANPP-2248.GION Vtt y U

U. S. Nuclear. Regulatory Commission-7

' Region V Creekside 0aks Office Park'

-1450 lbria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention: -Mr. D. !!. Sternberg, Chief Reactor Projects Branch 1

Subject:

Deficiency-Evaluation Report DER 82-74 A 50.55(e) Evaluation Relating to G. E. Protective Relays Hay-Nave Undersize / Loose Adjustment Bolts Files 82-019-026 D.4.33.2

Reference:

Telephone Conversation between P..Narbut and G. Duckworth on November 24, 1982

Dear Sir:

e The NRC was notified of the subject Deficiency Evaluation in the l

referenced telephone conversation, with a determination of reportability l

to be made within thirty (30) days (December 23, 1982).

l l

The deficiency has subsequently been determined to be Not Reportable under the requirements of 10CFR50.55(e), therefore no written report is l

required. Necessary documentation of the evaluation will be maintained l

In APS filea.

(

l Very truly yours, E.2.Ju Bu%

E. E. Van Brunt, Jr.

APS Vice President Nuclear Projects llanagement ANPP Project Director EEVBJr/ Gild:db Enclosure cca See Attached Page 2 E1140319821223anocn osooosas S

PDR,

I e

L'

7 h.

.a

_f~ _-_

^

o f: o.

L

~

..U. S. Nuclear Regulatory Commission ANPP-22587-GHD/BSK-December 23, 1982' Attention: >Mr. D..M. Sternberg, Chief Page-2

.cc:-Richard DeYoung, Director'.

Office of Inspection'and Enforcement' U. S. Nuclear' Regulatory Commission?

Washington, D.:C. 20555 T.' G. ~ Woods, Jr.

J. A. Roedel.

D. B. Fasnacht-G. C4'Andognini-1 J. R..Bynum A.J:.' Rogers-B. 3. Kaplan W. E. Ide J. Vorees J. A. Brand-JA. C. Gehr W. J. Stubblefield W. G. ' Bingham R. L. Patterson R. W. Welcher-R. !!. Grant.

D. R. Itawkinson -

L. E. Vorderbrueggen G. A. Flore111 P.~P. Klute Lynne Bernabei, Esq.

liarmon & Weiss 1725 "I" Street, NW Washington, D. C. 20006 R. L. Greenfield Assistant Attorney General Bataan Memorial Building Santa Fe, New Mexico 87503 t

l l~

. -