ML20028C902

From kanterella
Jump to navigation Jump to search
Forwards IE SERs 50-254/82-22 & 50-265/82-24 Conducted in Nov 1982.No Noncompliance Noted
ML20028C902
Person / Time
Site: Quad Cities  
Issue date: 12/20/1982
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20028C903 List:
References
NUDOCS 8301140281
Download: ML20028C902 (2)


See also: IR 05000254/1982022

Text

--

~

'M

,

hh

,

>

3y

m:

,;

,

,

-

-

,

A

I

4

+

c - -

.

,

,

a

4

.e'

De'cember 20, 1982'

u

-

- Docket.No.,50-254

Docket No. 50-265'

.

Commonwealth Edison Company

'

ATTN: . Mr. Cordell Reed -

Vice President ~-

' Post Office Box 767-

Chicago', IL 60690

Gentlemen:

- We have completed our review of,your revised Generating' Stations Emergency

Plan ~(GSEP) and Quad-Cities site specific annex dated November 1981 and Aprili

. 1982 respectively. Enclosed is a SafetytEvaluation Report (50-254/82-22;

50-265/82-24) with the NRC staff conclusions.

Our' review indicatedLthat your

plan meets the planning standards of 10 CFR'50.47(b) and ' the requirements of

Appendix E to.10 CFR 50.

Please be reminded that'10 CFR.50.54(q) requires

,

that changes to your plan may be made.without Commission approval only if

such changes do not decrease the' effectiveness of the plans and the plans,

as changed,_ continue to meet the standards of 50.47(b) and the requirements

of Appendix E - to 10 CFR 50.

In all cases, you should furnish copies of each

'

proposed change to the NRC in accordance 'with 10 CFR 50.54(q).

Any changes to the Emergency Plan Implementing Procedures should be made

pursuant to the requirements of 10 CFR 50, Appendix E, Section V (Implement-

ing Pro'cedures).

In'accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

,

this letter and the enclosed evaluation report will'be placed in the NRC's

Public Document Room.

If this report contains any.information that you (or

l

your contractors) believe to be' exempt from disclosure under 10 CFR 9.5(a)(4),

~

it is necessary that you (a) notify this office by telephone within ten (10)

t

days from the date of this letter of your intention to file a request from

1

withholding; and (b) submit within twenty-five (25) days from the date of

l'

this letter a written application to this office to withhold such information.

9 -

If your receipt of this letter has been delayed such that less than seven

(7) days are available for review, please notify this-office promptly so that

i

a new due date may be established. Consistent with Section 2.790(b)(1), any

i

such application must be accompanied by an affidavit executed by the owner

'

of the information which identifies the document or part sought to be withheld,

l

l

I

+

-

l

8301140201 821220

.-

'

PDRADOCK05000g

G

h

..

-

.

-

-

. _ _

.

.

- -

-

Y*' h5 .

.. _

..

'

,

.

.

.

'

,

.

.

y

+

Commonwealth. Edison: Company

~ 2

--December;20, 1982'

and which contains a full statement.of: the reasons which are the: bases for. <

the claim that the information should be withheld'from public disclosure.

This section further requires the statement to address'with specificity the

considerations-listed in 10 CFR-2.790(b)(4). The information sought to be~

withheld shall be incorporated as_far as_possible into a separate part of

the affidavit.

If we do not hear from you in this regard within the-speci-

fled periods noted above, a copy of this letter and the enclosed evaluation-

report will be placed in the NRC's Public Document Room.

,

Your cooperation with us is appreciated.

~

Sincerely,

.

I

-

J.

. Hin , Director

' Division of Emergency Preparedness

'

and Operational Support

Enclosures: Safety

Evaluation Reports

f

No. 50-254/82-22(DEPOS);

No. 50-265/82-24(DEPOS)

,

cc w/ encl:

Louis O. De1 George, Director

of Nuclear Licensing

N. Kalivianakis, Plant

Superintendent

'DMB/ Document Control Desk (RIDS)

Resident ~ Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney General

F. Pagano, Jr. , EPLB, IE

D. Bement, FEMA Region V

S. Ferris, FEMA Region VII

-R. Bevan, Jr., LPM,' NRR

I

' M II

IT

RI

d

(9

J Ir)

j'

ips/jp

' Axe on

Papj n:iello

al e

H' d

12 16/82

g2

$1 gF

.

[ -2. f,/ f "8'

n

..

>