ML20028C822

From kanterella
Jump to navigation Jump to search
Forwards IE SERs 50-282/82-21 & 50-306/82-21 on 821110-1206.No Noncompliance Noted
ML20028C822
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 12/27/1982
From: Hind J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
Shared Package
ML20028C823 List:
References
NUDOCS 8301140179
Download: ML20028C822 (2)


See also: IR 05000282/1982021

Text

--ww-

--

...

,

.-

December 27, 1982

'

Docket No. 50-282

Docket No. 50-306

Northern States Power Company

ATIN:

Mr.

C.'E. Larson

Director of Nuclear

Generation

414 Nicollet Mall

Minneapolis, MN 55401

Gentlemen:

We have completed our review of the revised Corporate Emergency Plan dated

May 1982, and the Prairie Island Site Emergency Plan dated October 1982.

Enclosed is a Safety Evaluation Report (50-282/82-21; 50-306/82-21) with the

NRC staff conclusions. Our review indicated that your plan meet the planning

standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

Please be reminded that 10 CFR 50.54 requires that changes to your plan may

be made without Commission approval only if such changes do not decrease the

effectiveness of the plans and the plans as changed, continue to meet the

standards of 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR 50.

In all cases, you should furnish copies of each proposed change to the NRC

in accordance with 10 CFR 50.54(q).

Any changes to the Emergency Plan Implementing Procedures should be made

in accordance with the requirements of 10 CFR 50, Appendix E, Section V

(Implementing Procedures).

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you (or

your contractors) believe to be exempt from disc 1csure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for with-

holding; and (b) submit within twenty-five (25) days from the date of this

letter a written application to this office to withhold such information.

If

,

l

.

.

i

1

_ _ ,

8301140179 821227

pDR ADOCK 05000282

o

PDR

M .,35

,

,

c;

_

==

.

. . .

Northern St'ates Power Company

2

. December 27, 1982-

'

1

your receipt; of this letter has been ' delayed such that; 1ess than seven (7) ' days

'

'

_

,

are available for your review, please notify this office promptly so that a new-

j

due date may be established. Consistent with Section 2.790(b)(1), any:such -

application.must be accompanied by an affidavit executed by the owner of the.

-

information which identifies the document or part sought to be. withheld, and

,

which contains a full statement of the reasons which are the bases-for the

claim that the information should be withheld from public disclosure. This

section further requires the statement to address with specificity the con-

i'

siderations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated.as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified-

periods noted above, a copy of this letter and the enclosed inspection report

will be placed in the Public Document Room.

Your cooperation with us is appreciated.

Sincerely,

~

ll

J.

Hind,

irector

Division of Emergency Preparedness

and Operational Support

Enclosure:

Inspection Repor

No. 50-282/82-21(DEPOS) and

No. 50-306/82-21(DEPOS)

cc w/ enc 1:

E. L. Watzl, Plant Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Prairie

Island

Resident Inspector, RIII Monticello

John W. Ferman, Ph.D., Nuclear

Engineer, MPCA

D. DiIanni, ORB No. 3/NRR

D. Bement, FEMA, Region V

F. Pagano, DEP/0IE

RIII

RIII M

RI I

R

.

I

j'

\\

Pathrson/sv

(Axeson

Pp i llo

yes

n

12/20/82

fk , L

y&

.

>