Text
e
s
DEC 2 31982
License No. DPR-28
Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTN: Mr. Warren P. Murphy
.Vice President and Manager of Operations
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
Gentlemen:
Subject:
Inspection No. 50-271/82-22
This refers to the routine safeguards inspection conducted by Mr. G. C. Smith
of this office on November 29 - December 3,1982, at the Vermont Yankee Nuclear
Power Station Vernon, Vermont, of activities authorized by NRC License No. DPR-28
and to the discussions of our findings held by Mr. Smith with Mr. J. P. Pelletier
of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
!
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
the date of this letter.
Such application must be consistent with the require-
ments of 2.790(b)(1). The telephone notification of your intent to request
withholding, or any request for an extension of the 10 day period which you
believe necessary, should be made to the Supervisor, Files Mail and Records,
F
USNRC Region I, at (215) 337-5223.
No reply to this letter is required.
Your cooperation with us in this matter
is apprec'ated.
Sincerely,
gragind && sped ka
Jb4 W
C'eNd
_ h
Thomas T. Martin, Director
,
Division of Engineericg and
.-
I
Technical Programs
Enclosure: NRC Region I Inspection Report No. 50-271/82-22
l
0301140048 821229
-
0FFICIAL RECORD COPY
l
PDR ADOCK 05000271
G
,
/6 /s tf
_
_ _- -
e-
o
' Vermont Yankee Nuclear Power Corp.
2
DEC 2 91982
cc w/ enc 1:
Mr. J. B. Sinclair, Licensing Engineer
Mr. W. F.~ Conway, President and Chief Executive ut/icer
Mr. J. P. Pelletier, Plant. Manager
Mr. L. H. Heider, Vice President
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
State of New Hampshire
State of Vermont
bcc w/ enc 1:
Region I Docket Room (w/ concurrences)
Senior Operations Support Officer (w/o enc 1)
DPRP Section Chief
1
RI:DE
R-
Jo
Ma in
(
th:as
W}yner9f gv'
2M82
6
7
0FFICIAL RECORD COPY
. - .
.
-.
,
- - -