Forwards IE Insp Rept 50-346/82-32 on 821101-30.No Noncompliance Noted
ML20028C206
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/22/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20028C207 List:
References
RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8301070203
Download: ML20028C206 (2)


See also: IR 05000346/1982032

Text

.

.

DEC 2 21982

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

3i0 Madisan Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

T. A. Peebles and W. Rogers of this office on November 1-30, 1982, of ac-

tivities at Davis-Besse authorized by NRC Operating License No. NPF-3 and

to the discussion of our findings with Mr. T. Murray at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection.

Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any infermation

,

that you (or your contractors) believe to be exempt from disclosure under

!

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

,

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

-

i

8301070203 821222

T

()f

PDR ADOCK 05000346

l

~

O

PDR

'

_ _ _

'

.

. ~

_

- _ . . _ _ _ _

.

.

.

.

Toledo Edison Company

2

December 22, 1982

which identifies the document or part sought to be withheld, and which

j

contains a full statement of the reasons which are the bases for the

i

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

l

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely

J. F. Streeter, Chief

Projects Branch 2

Enclosure:

Inspection Report

No. 50-346/82-32(DPRP)

cc w/ encl:

T. D. Murray, Station

Superintendent

l

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Helen W. Evans, State of Ohio

Robert M. Quillin, Ohio

3

Department of Health

I

R

RIII

% g4

es/sv

Streeter

/20/82

I?./;t?,

--

-

-

.

. . . - -

-- -. .

..