ML20028C206
| ML20028C206 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 12/22/1982 |
| From: | Streeter J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Crouse R TOLEDO EDISON CO. |
| Shared Package | |
| ML20028C207 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8301070203 | |
| Download: ML20028C206 (2) | |
See also: IR 05000346/1982032
Text
.
.
DEC 2 21982
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Richard P. Crouse
Vice President
Nuclear
Edison Plaza
3i0 Madisan Avenue
Toledo, OH 43652
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
T. A. Peebles and W. Rogers of this office on November 1-30, 1982, of ac-
tivities at Davis-Besse authorized by NRC Operating License No. NPF-3 and
to the discussion of our findings with Mr. T. Murray at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
No items of noncompliance with NRC requirements were identified during the
course of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any infermation
,
that you (or your contractors) believe to be exempt from disclosure under
!
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
,
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must
be accompanied by an affidavit executed by the owner of the information
-
i
8301070203 821222
T
()f
PDR ADOCK 05000346
l
~
O
'
_ _ _
'
.
. ~
_
- _ . . _ _ _ _
.
.
.
.
Toledo Edison Company
2
December 22, 1982
which identifies the document or part sought to be withheld, and which
j
contains a full statement of the reasons which are the bases for the
i
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
l
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter and the enclosed
inspection report will be placed in the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely
J. F. Streeter, Chief
Projects Branch 2
Enclosure:
Inspection Report
No. 50-346/82-32(DPRP)
cc w/ encl:
T. D. Murray, Station
Superintendent
l
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Helen W. Evans, State of Ohio
Robert M. Quillin, Ohio
3
Department of Health
I
R
RIII
% g4
es/sv
Streeter
/20/82
I?./;t?,
--
-
-
.
. . . - -
-- -. .
..