ML20028C112
| ML20028C112 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 12/17/1982 |
| From: | Scott D COMMONWEALTH EDISON CO. |
| To: | Harold Denton Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20028C109 | List: |
| References | |
| 81-264, NUDOCS 8301070046 | |
| Download: ML20028C112 (5) | |
Text
Comm:nwealth Edison Drisden Nucle:r Pow;r Stitirn R.R. # 1 M:rris. Illinois 60450 Telephone 815/942-2920 Date 0 00rm_ i o_ (\\
\\ 9, I k N_
~-
DJS LTR:
81-264 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission l
Washington, D.C.
20555 l
Subject:
Emergency Plan Implementing Procedures for Dresden Station Units 1, 2, and 3; NRC Docket Nos. 50-10, 50-237, and 50-249
References:
(a) D. J. Scott letter to H. R. Denton, dated March 12, 1981 (b) Title 10, Code of Federal Regulations, Appendix E, Part V
Dear Mr. Denton:
Enclosed are ten (10) copies of revisions to Dresden Station Emergency Plan Implementing Procedures.
No return of transmittals is necessary.
Sincerely, I
(.h D.
. Scott Station Superintendent Dresden Nuclear Power Station
'DJS:TGB:mt 4
Enclosures f
cc:
T. Blackmon h
File /NRC 3
j File / Numerical
N hhf 8301070046 830103 PDR ADOCK 05000010 F
=
-=
- .=..
'~
DAP 9-2
~
Revision 12 DRESDEN STATION PROCEDURE ROUTING
\\
(TRANSMITTAL RECEIPT) er No.
O-s
_: :. ~ m +-
~
.;;_.u=
[O h T d OO - N
, t A #11. k
=
~
~
REMOVE:
'~
m I
~
~' Z.1.. ~ ~ ~
~_!
' T..
~~
fn 999 _. oO - ti i t A i 1 Y.
INSERT:
~
(Sign and return this form to the Procedures Manager.)
~ -
I hereby acknowledge receipt of the above.
Signed Date
~
FORM 9-2A (Cont'd.)
APPROVED O
E 10'82
~D.O.S.R-i 24 of 32 l
DAP 9-2 Revision 12 PROCEDURE HISTORY AND SAFETY EVALUATION Procedure
'F#IP Fes - //
R ev. N o.
2 Description of Procedure Revision or of New Procedure k
r% m
.Y S k.
nw
.&r-
. nuQ +/
/$
/2 7 r-4 me s
Acd a
nM a O /M sUaf L A JA/
A DJ AJM nJ AAVJ sm.b D ' '. ' ' ' - $kT/V$
J 1A A
24 D, /2 (L s ' M,A gf/
/
Justification for New or Revised Procedure rN Y
boz26<2A Y<:, A m t f ash d%;
L kJJlJA
_h 1 m 1
A ert w
]
.m 1
+
Supportive References (Letters, Temporary Change Requests, Procedure Inquiry, N U R EG, etc.)
FORM 9-2B MYM 25of32 E 1072
.Q.0.S.R.
t
.~
EPIP 300 EMERGENCY MEASURES O
300-1 Initial Notifications and GSEP Responses Rev. 3 1/82 (Primary Responsibility - Station Director) 300-C1 Nuclear Accident Reporting System Form Rev. 2 5/81 (Primary Responsibility - Station Director) 300-T1 Table of Conditions Requiring Post-Accident Lineup of the High Radiation Sampling System and Use of Post-Accident Sampling Procedures
- Rev. 0 5/82 l
l 300-2 On-Going Emergency Communications Rev. 1 3/81 (Primary Responsibility - Station Director) 300-3 Assembly and Evacuation of Personnel Rev. 2 4/82 (Primary Responsibility - Operations Director) 300-4 Emergency Dose Limits and Radiological Controls Rev. 0 7/80 for Rescue and Recovery Operations (Primary l
Responsibility - Rad / Chem Director) 300-5 Emergency Treatment of Injured Personnel Rev. 2 5/82 (Primary Responsibility - Operations Director) 300-6 Survey of Injured Personnel Rev. 0 7/80 O
(Primary Responsibility - Rad / Chem Director) 4
- 300-7 Personnel Decontamination (Medical -
Rev. 0 7/80 Decontamination Area) (Primary Responsibility
- Rad / Chem Director) 300-8 Post-Accident Sampling of Primary Containment Rev. 2 5/82 Atmosphere (Primary Responsibility - Rad / Chem Director) l 300-9 Post-Accident Sampling of Reactor Coolant Rev. 3 10/82 (Primary Responsibility - Rad / Chem Director)
I 300-10 Post-Accident Sampling and Release Rate Rev.,2 11/82 Determination of Radiciodines and Particulates (Primary Responsibility - Rad / Chem Director) i 300-11 Post-Accident Noble Gas Release Rate Determina-tion (Primary Responsibility - Rad / Chem Director) Rev. 2 12/82 300-12 Initiation of Environmental Monitoring Activities Rev. 0 7/80 by the Rad / Chem Director (Primary Respo'nsibility - Rad / Chem Director) 300-13 Rad./ Chem. Technicians Action at Hospital Rev. 0 7/80 (Primary Responsibility - Rad / Chem Director)
O 1 of 2 h
l
^-
EPIP 300 EMERGENCY MEASURES (Cont'd)
O I
300-14 Estimation of Off-Site Dose From an Unplanned Rev. 0 7/80 Release of Raddoactive Effluents l
(Primary Responsibility - Rad / Chem Director) 300-15 Deployment of the Eberline SAM-2 Stabilized Rev. 1 3/81 Assay Meter (Primary Responsibility - Rad / Chem Director)
I 1
O l
O DEC101982 j
2 of 2 d
l
-..