ML20028C112

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Rev 2 to Emergency Plan Implementing Procedure 300-11, Post-Accident Noble Gas Release Rate Determination. Receipt Form & Revised Table of Contents Encl
ML20028C112
Person / Time
Site: Dresden  Constellation icon.png
Issue date: 12/17/1982
From: Scott D
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20028C109 List:
References
81-264, NUDOCS 8301070046
Download: ML20028C112 (5)


Text

Comm:nwealth Edison Drisden Nucle:r Pow;r Stitirn R.R. # 1 M:rris. Illinois 60450 Telephone 815/942-2920 Date 0 00rm_ i o_ (\\

\\ 9, I k N_

~-

DJS LTR:

81-264 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission l

Washington, D.C.

20555 l

Subject:

Emergency Plan Implementing Procedures for Dresden Station Units 1, 2, and 3; NRC Docket Nos. 50-10, 50-237, and 50-249

References:

(a) D. J. Scott letter to H. R. Denton, dated March 12, 1981 (b) Title 10, Code of Federal Regulations, Appendix E, Part V

Dear Mr. Denton:

Enclosed are ten (10) copies of revisions to Dresden Station Emergency Plan Implementing Procedures.

No return of transmittals is necessary.

Sincerely, I

(.h D.

. Scott Station Superintendent Dresden Nuclear Power Station

'DJS:TGB:mt 4

Enclosures f

cc:

T. Blackmon h

File /NRC 3

j File / Numerical

N hhf 8301070046 830103 PDR ADOCK 05000010 F

PDR

=

-=

.=..

'~

DAP 9-2

~

Revision 12 DRESDEN STATION PROCEDURE ROUTING

\\

(TRANSMITTAL RECEIPT) er No.

O-s

.s.1 A/#/ TAC 4L1-6it)

_: :. ~ m +-

~

.;;_.u=

[O h T d OO - N

, t A #11. k

=

~

~

REMOVE:

'~

m I

~

~' Z.1.. ~ ~ ~

~_!

' T..

~~

fn 999 _. oO - ti i t A i 1 Y.

INSERT:

~

(Sign and return this form to the Procedures Manager.)

~ -

I hereby acknowledge receipt of the above.

Signed Date

~

FORM 9-2A (Cont'd.)

APPROVED O

E 10'82

~D.O.S.R-i 24 of 32 l

DAP 9-2 Revision 12 PROCEDURE HISTORY AND SAFETY EVALUATION Procedure

'F#IP Fes - //

R ev. N o.

2 Description of Procedure Revision or of New Procedure k

r% m

.Y S k.

nw

.&r-

. nuQ +/

/$

/2 7 r-4 me s

Acd a

nM a O /M sUaf L A JA/

A DJ AJM nJ AAVJ sm.b D ' '. ' ' ' - $kT/V$

J 1A A

24 D, /2 (L s ' M,A gf/

/

Justification for New or Revised Procedure rN Y

boz26<2A Y<:, A m t f ash d%;

L kJJlJA

_h 1 m 1

A ert w

]

.m 1

+

Supportive References (Letters, Temporary Change Requests, Procedure Inquiry, N U R EG, etc.)

FORM 9-2B MYM 25of32 E 1072

.Q.0.S.R.

t

.~

EPIP 300 EMERGENCY MEASURES O

300-1 Initial Notifications and GSEP Responses Rev. 3 1/82 (Primary Responsibility - Station Director) 300-C1 Nuclear Accident Reporting System Form Rev. 2 5/81 (Primary Responsibility - Station Director) 300-T1 Table of Conditions Requiring Post-Accident Lineup of the High Radiation Sampling System and Use of Post-Accident Sampling Procedures

  • Rev. 0 5/82 l

l 300-2 On-Going Emergency Communications Rev. 1 3/81 (Primary Responsibility - Station Director) 300-3 Assembly and Evacuation of Personnel Rev. 2 4/82 (Primary Responsibility - Operations Director) 300-4 Emergency Dose Limits and Radiological Controls Rev. 0 7/80 for Rescue and Recovery Operations (Primary l

Responsibility - Rad / Chem Director) 300-5 Emergency Treatment of Injured Personnel Rev. 2 5/82 (Primary Responsibility - Operations Director) 300-6 Survey of Injured Personnel Rev. 0 7/80 O

(Primary Responsibility - Rad / Chem Director) 4

  • 300-7 Personnel Decontamination (Medical -

Rev. 0 7/80 Decontamination Area) (Primary Responsibility

- Rad / Chem Director) 300-8 Post-Accident Sampling of Primary Containment Rev. 2 5/82 Atmosphere (Primary Responsibility - Rad / Chem Director) l 300-9 Post-Accident Sampling of Reactor Coolant Rev. 3 10/82 (Primary Responsibility - Rad / Chem Director)

I 300-10 Post-Accident Sampling and Release Rate Rev.,2 11/82 Determination of Radiciodines and Particulates (Primary Responsibility - Rad / Chem Director) i 300-11 Post-Accident Noble Gas Release Rate Determina-tion (Primary Responsibility - Rad / Chem Director) Rev. 2 12/82 300-12 Initiation of Environmental Monitoring Activities Rev. 0 7/80 by the Rad / Chem Director (Primary Respo'nsibility - Rad / Chem Director) 300-13 Rad./ Chem. Technicians Action at Hospital Rev. 0 7/80 (Primary Responsibility - Rad / Chem Director)

O 1 of 2 h

l

^-

EPIP 300 EMERGENCY MEASURES (Cont'd)

O I

300-14 Estimation of Off-Site Dose From an Unplanned Rev. 0 7/80 Release of Raddoactive Effluents l

(Primary Responsibility - Rad / Chem Director) 300-15 Deployment of the Eberline SAM-2 Stabilized Rev. 1 3/81 Assay Meter (Primary Responsibility - Rad / Chem Director)

I 1

O l

O DEC101982 j

2 of 2 d

l

-..