Responds to TMI-1 Restart Certification Status Memo Dtd 821208.Adequacy of Onsite Technical Support Ctr Reviewed & Found Acceptable for Restart
ML20028B953
Person / Time
Site: Crane Constellation icon.png
Issue date: 12/29/1982
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Jonathan Montgomery
NRC OFFICE OF POLICY EVALUATIONS (OPE)
Shared Package
ML20028B954 List:
References
NUDOCS 8301040125
Download: ML20028B953 (3)


Text

'&,o_of4 d

occ,3 333a Docket !!n.50-23q NEMORA!iDtri FOR: John l'ontqonery, Office of Policy Evaluation FR0!1:

Darrell Eisenhut, Director Division of Licensino SO3 JECT:

THI-l RESTART CERTIFICATI0il STATUS QUESTIOiS Tho answers to your questions concerninq the TMI-1 Restart Certification Status draf t neno of Decenber R,1982 are as follows:

Ouestion 1.a - Order Ite'18, Iten 2.2.2B - what criteria will be used to review the adoquacy of the Onsite Technical Support Center?

Answer:

Tho adequacy of the Onsite Technical Support Center (TSC) has been reviewed by the staff and found acceptable for restart as described in NUREG-0630 and HUREG-0680, Supplenent 3.

The renaining staff action for this iton is to verify nodifications and the availability of selected records and drawinqs in the TSC. A supplement to f'UREC 0737 will be used as the basis for a cost-innlenentation review of the fir.a1 f acilities; schedule to be negotiate:1 af ter issuance of 10 CFR 50.54(f) letters.

Question 1.5 - Iten 0.IV.1.H - On staff review of EP brochures and panphlets, the colunn labeled Inspection / Review Status states "imC advise Connission."

noes this nean " staff advise Coanission" or serethinq else?

Answer: This means " staff advise Connission."

Question 1.c - Appeal Board Iten III.A,2.

Is this iten accurate? Will final

!NC onerqency response plans really be r odified and distributed in final forn by 1/P3? Isn't sono Connission action necessary before this can be acconolished?

Answer - The staf f plans to address Appeal Board imposed requirenent III.A.2 in January 1983.

No Connission action is deemed necessary to conplete this iten, hasod on a reviov by Region I, IE and ELD personnel, as no changes in Connission apnroved plan concepts are contonplated.

r]uestion 2 - Will GPU be using non-GPU oerennei to assist during THI-1 startun?

E.g., BN personnel, consultinq firns, etc.?

Answer - In a phone call with GPU licensing personnel, the following infornation was provided:

- There is an onsite P'.M enqineer who is a nenber of GPU's Test vorkino Group who will he involved in startup testinq activities.

8301040125 821229 PDR ADOCK 05000289 P

PDR 3_

OFFICE >

sunu m )

DATF)

Merenursm n ucuem OFFICIAL RECORD COPY m

-2 ; w

~

l l

i, s.

t e

I John Montgonery !

- It is planned that 2-3 HSW engineers will be available during low power natural circulation testing.

- It is anticipated that some Bfol fuci perfornance specialists will be onsite to nonitor physics testing.

aby OrigiDD1gign enhut tarren g m~

Darrell Eisenhut, Director Division of Licensing l

cc: JRoe i

H9enton DISTRIBUH

@ cket File w/inc_

a NRC PDR i

L PDR DEisenhut RPurple PCheck BSnyder JHeltemes l

JStol z l

JVan Vliet w/inc. & Ticket i

DNottingham l

Yellow Ticket File w/in'c.

l Rm. 416 RIngram MGarver (NRR-82-511)

MJambour ECase HDenton PPAS RVollmer RMattson HThompson Schroeder BGrimes ORB #4 Rdg ORB #4 Memo File

  • See previous (NiC 3lS white)for concurrences.

. 0R.B#4

. c,,0RB#,4 DL,,, AD : 0R,,: DL.,,,

,,,0..

1

.. A;.E.P.:.IE......

o,,,c I sun,..e > J.Y.es...Y.119..u;.f...mo.1.T.*............h J.nu *...

...D s'

u.t....Bar.ime e.....

l om>.1.u;Lis2....

..).2/.zz/s2......

..1u.zz/az......1.2q/s 2.....12/2zfaz..-

OFFICIAL RECORD COPY usceo. nei-moeo Hnc,onc,.,oy,yncymu

I

(

W ASHINGTON, D. C. 20555 e...*

Docket No. 50-289 MEMORANDUM FOR: John Montgomery, Of fice of Policy Evaluation FROM:

Darrell Eisenhut, Director Division of Licensing

SUBJECT:

TMI-1 RESTART CERTIFICATION STATUS QUESTIONS f

The answers to your questions concerning the TMI-l Restart Certificat Status draf t memo of De'cember 8,1982 are as follows:

Question 1.a - Order Item 8DItem 2.2.2B - what criteria will e used to review the adequacy of the Onsite Technical Support Center?

N Answer: The adequacy of the Onsit'e Technical Support C ter(TSC)hasbeen s

reviewed by the staff and found acceptable for restar as described in NUREG-0680 and NUREG-0680, Supplement 3.

The remai ng staff action for this item is to verify the availability of selected r ords and drawings in the TSC.

\\

Question 1.b - Item D.IV.l.B - On staff revi of EP brochures and pamphlets, the column labeled Inspection / Review Statu states "NRC advise Commission."

Does this mean " staff advise Commission" r som'ething else?

Answer: This means " staff advise Com ssion."

Question 1.c - Appeak Board Item II.A.2.

Is this ite'nt accurate? Will final NRC emergency response plans r 11y be modified and dishibuted in fi.tal form by 1/83? Isn't some Commiss on action necessary before this can be accomplished?

\\

Answer - The staff plans o complete Appeal Board imposed requirement III. A.2 in January 198 No Commission action is deemed necessary to complete this item, based on a eview bu Region I, IE and ELD personnel.\\

\\

Question 2 - Will Q U be using non-GPU personnel to assist during'TMI-l startup?

E.g / B&W personnel, consulting firms, etc.?

'N l

l Answer - In a one call with GPU licensing personnel, the following information I

was provided:

\\

- There, is an onsite B8W engineer who is a member of GPU's Test Working Groud who will be involved in startup testing activities.

\\

- It is planned that 2-3 B&W engineers will be available during low po\\

/

l we n'atural circulation testing.

/

- It is anticipated that some B&W fuel performance specialists will be s

/ onsite to monitor physics testing.

j

//

[

Darrell Eisenhut, Director Division of Licensing t

cc: JRoe HDenton g

f q

4

..Er,f,;,I[s

...0RBf4.:dF2

..C.0RM.4 GRADL.

.. D.: DL.......

0:E OFFICE) JVan V1iet;c JStol

..,gla4nas; DEisenhut ime sunuuc )

12gz82 12/gt 2 1;d,2 qc.,za2

.3.pfg g.

om, nnc rosu m oo aoi sacu ma OFFICIAL RECORD COPY

~

usceo. nu-m n

,