occ,3 333a Docket !!n.50-23q NEMORA!iDtri FOR: John l'ontqonery, Office of Policy Evaluation FR0!1:
Darrell Eisenhut, Director Division of Licensino SO3 JECT:
THI-l RESTART CERTIFICATI0il STATUS QUESTIOiS Tho answers to your questions concerninq the TMI-1 Restart Certification Status draf t neno of Decenber R,1982 are as follows:
Ouestion 1.a - Order Ite'18, Iten 2.2.2B - what criteria will be used to review the adoquacy of the Onsite Technical Support Center?
Answer:
Tho adequacy of the Onsite Technical Support Center (TSC) has been reviewed by the staff and found acceptable for restart as described in NUREG-0630 and HUREG-0680, Supplenent 3.
The renaining staff action for this iton is to verify nodifications and the availability of selected records and drawinqs in the TSC. A supplement to f'UREC 0737 will be used as the basis for a cost-innlenentation review of the fir.a1 f acilities; schedule to be negotiate:1 af ter issuance of 10 CFR 50.54(f) letters.
Question 1.5 - Iten 0.IV.1.H - On staff review of EP brochures and panphlets, the colunn labeled Inspection / Review Status states "imC advise Connission."
noes this nean " staff advise Coanission" or serethinq else?
Answer: This means " staff advise Connission."
Question 1.c - Appeal Board Iten III.A,2.
Is this iten accurate? Will final
!NC onerqency response plans really be r odified and distributed in final forn by 1/P3? Isn't sono Connission action necessary before this can be acconolished?
Answer - The staf f plans to address Appeal Board imposed requirenent III.A.2 in January 1983.
No Connission action is deemed necessary to conplete this iten, hasod on a reviov by Region I, IE and ELD personnel, as no changes in Connission apnroved plan concepts are contonplated.
r]uestion 2 - Will GPU be using non-GPU oerennei to assist during THI-1 startun?
E.g., BN personnel, consultinq firns, etc.?
Answer - In a phone call with GPU licensing personnel, the following infornation was provided:
- There is an onsite P'.M enqineer who is a nenber of GPU's Test vorkino Group who will he involved in startup testinq activities.
8301040125 821229 PDR ADOCK 05000289 P
PDR 3_
OFFICE >
sunu m )
DATF)
Merenursm n ucuem OFFICIAL RECORD COPY m
-2 ; w
~
l l
i, s.
t e
I John Montgonery !
- It is planned that 2-3 HSW engineers will be available during low power natural circulation testing.
- It is anticipated that some Bfol fuci perfornance specialists will be onsite to nonitor physics testing.
aby OrigiDD1gign enhut tarren g m~
Darrell Eisenhut, Director Division of Licensing l
cc: JRoe i
H9enton DISTRIBUH
@ cket File w/inc_
a NRC PDR i
L PDR DEisenhut RPurple PCheck BSnyder JHeltemes l
JStol z l
JVan Vliet w/inc. & Ticket i
DNottingham l
Yellow Ticket File w/in'c.
l Rm. 416 RIngram MGarver (NRR-82-511)
MJambour ECase HDenton PPAS RVollmer RMattson HThompson Schroeder BGrimes ORB #4 Rdg ORB #4 Memo File
- See previous (NiC 3lS white)for concurrences.
. 0R.B#4
. c,,0RB#,4 DL,,, AD : 0R,,: DL.,,,
,,,0..
1
.. A;.E.P.:.IE......
o,,,c I sun,..e > J.Y.es...Y.119..u;.f...mo.1.T.*............h J.nu *...
...D s'
u.t....Bar.ime e.....
l om>.1.u;Lis2....
..).2/.zz/s2......
..1u.zz/az......1.2q/s 2.....12/2zfaz..-
OFFICIAL RECORD COPY usceo. nei-moeo Hnc,onc,.,oy,yncymu
I
(
W ASHINGTON, D. C. 20555 e...*
Docket No. 50-289 MEMORANDUM FOR: John Montgomery, Of fice of Policy Evaluation FROM:
Darrell Eisenhut, Director Division of Licensing
SUBJECT:
TMI-1 RESTART CERTIFICATION STATUS QUESTIONS f
The answers to your questions concerning the TMI-l Restart Certificat Status draf t memo of De'cember 8,1982 are as follows:
Question 1.a - Order Item 8DItem 2.2.2B - what criteria will e used to review the adequacy of the Onsite Technical Support Center?
N Answer: The adequacy of the Onsit'e Technical Support C ter(TSC)hasbeen s
reviewed by the staff and found acceptable for restar as described in NUREG-0680 and NUREG-0680, Supplement 3.
The remai ng staff action for this item is to verify the availability of selected r ords and drawings in the TSC.
\\
Question 1.b - Item D.IV.l.B - On staff revi of EP brochures and pamphlets, the column labeled Inspection / Review Statu states "NRC advise Commission."
Does this mean " staff advise Commission" r som'ething else?
Answer: This means " staff advise Com ssion."
Question 1.c - Appeak Board Item II.A.2.
Is this ite'nt accurate? Will final NRC emergency response plans r 11y be modified and dishibuted in fi.tal form by 1/83? Isn't some Commiss on action necessary before this can be accomplished?
\\
Answer - The staff plans o complete Appeal Board imposed requirement III. A.2 in January 198 No Commission action is deemed necessary to complete this item, based on a eview bu Region I, IE and ELD personnel.\\
\\
Question 2 - Will Q U be using non-GPU personnel to assist during'TMI-l startup?
E.g / B&W personnel, consulting firms, etc.?
'N l
l Answer - In a one call with GPU licensing personnel, the following information I
was provided:
\\
- There, is an onsite B8W engineer who is a member of GPU's Test Working Groud who will be involved in startup testing activities.
\\
- It is planned that 2-3 B&W engineers will be available during low po\\
/
l we n'atural circulation testing.
/
- It is anticipated that some B&W fuel performance specialists will be s
/ onsite to monitor physics testing.
j
//
[
Darrell Eisenhut, Director Division of Licensing t
cc: JRoe HDenton g
f q
4
..Er,f,;,I[s
...0RBf4.:dF2
..C.0RM.4 GRADL.
.. D.: DL.......
0:E OFFICE) JVan V1iet;c JStol
..,gla4nas; DEisenhut ime sunuuc )
12gz82 12/gt 2 1;d,2 qc.,za2
.3.pfg g.
om, nnc rosu m oo aoi sacu ma OFFICIAL RECORD COPY
~
usceo. nu-m n
,