U-0581 ILLIN0/S POWER COMPANY L30-82(12-02)6 fp B24-82(12-02)6 500 SOUTH 27TH STREET, DECATUR, ILLINOIS 62525 December 2, 1982 Mr. Cecil 0. Thomas, Chief Standardization & Special Projects Branch Division of Licensing Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Thomas:
Clinton Power Station Unit 1 Docket No. 50-461 To resolve SER Confirmatory Issue #7 (3.8.3) Illinois Power Company has undertaken a Masonry Blockwall Test Program to' determine the modulus of rupture of concrete block masonry walls representative of the masonry walls of Clinton-Power Station Unit #1.
Construction of the masonry test walls at Construction Technology Laboratories (CTL) a Division of Portland Cement Association (PCA) has been completed.
Testing of these walls will commence at 1:00 p.m. December 20, 1982 and will continue through December 21, 1982.
As previously discussed with Mr. David Jeng NRC-SEB, the NRC is welcome to witness any part or all of the above testing.
The PCA Laboratories are located at:
5420 Old Orchard Road Skokie, Illinois 60077 and the CTL engineer in charge is:
Paul S. Johal Phone - (312)966-6200 QDO I 8212070200 821202
{DRADOCK05000gg
U-0581 L30-82(12-02)6 i
B24-82(12-02)6 December 2, 1982 Page 2 If any information regarding this testing is required, please contact:
H. B. Perkins Supervisor Civil / Structural Engineering Illinois Power Company NSED Phone (217)424-6975 Sincerely, JESVA<
G. E. Wuller Supervisor-Licensing Nuclear Station Engineering GEW/jmm cc:
J. H. Williams, NRC Clinton Proj ect Manager D. Jeng, NRC SEB H. H. Livermore, NRC Resicent Inspector Illinois Department of Nuclear Safety
,