3 nq+3 Filo Cop 7
NOV 121982
-
Docket:
50-368/82-32
Arkansas Power and Light Company
ATTN:
Mr. William Cavanaugh III
Senior Vice President - Energy Supply
P. O. Box 551
Little Rock, Arkansas 72203
Gentlemen:
This refers to the inspection conducted by Mr. D. P. Tomlinsen and J. E. Cummins
of our staff during October 25-29, 1982, of activities authorized by NRC
Facility Operating License NPF-6 for the Arkansas Nuclear One, Unit 2, and to
the discussion of our findings with Mr. J. M. Levine and other members of your
staff at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
Within the scope of the inspection, no violations or deviations were identi-
fied.
One new unresolved item is identified in paragraph 2 of this report. With
regard to this item, you are requested to provide a summary report to this
office, within 30 days from the date of this letter, on the deficiencies identi-
fied during systems walkdown inspections conducted at Arkansas Nuclear One,
Unit 2, during October 1982.
Your report should include your assessment of
the basic causes of the deficiencies, the corrective action you plan to take
to prevent recurrence of these types of deficiencies in the future, the changes
you plan to make to assure the timely processing of as-built drawings, and
the date when these actions will be completed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter and submit written
application to withhold information contained therein within 30 days of the
date of this letter.
Such application must be consistent with the
requirements of 2.790(b)(1).
DRRP&EP][.
/60/
ES g
R
IV
RPB2
DPTom inson:gb DMHunnicutt
WDJojir/ son WCSeidib JEGagl a'do
o} lins
11/4/82
11/y/82
11/'f/82 11/4/82 11/
2
1/j/82
8212030104 821112
PDR ADOCK 05000368
G
l
.
6
Arkansas Power and Light
2
Company
I
t
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
- Orfeln.11 Signed byY
W. C. SCIOLE"
1
W. C. Seidle, Chief
Reactor Project Branch 2
Enclosure:
Appendix - NRC Inspection Report 50-368/82-32
'
cc w/ enclosure:
Arkansas Nuclear One
i
ATTN:
J. M. Levine, General Manager
P. O. Box 608
Russellville, Arkansas 72801
bec to DMB:
IE01
bcc to RIV:
RESIDENT INSPECTOR
SECTION CHIEF
MIS
RIV FILE
STATE
RPBJL
J. COLLINS
E. JOHNSON
'
'
D. TOMLINSON
W. JOHNSON
'
G. VISSING, NRR
C. TRAMMELL, NRR
.
, ~ . _ , . . , _
_ _ . _ . _ .
, . . - . -
_,
__
__-
.-.
_._.
._ _ _ . -
, _ . , ,