Forwards IE Insp Rept 50-213/82-18 on 820929-1001.No Noncompliance Noted
ML20028B701
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 11/17/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Counsil W
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20028B702 List:
References
NUDOCS 8212030165
Download: ML20028B701 (2)


See also: IR 05000213/1982018

Text

.

-

. >

.,

.

17 NOV 1982

.

Docket No. 50-213

Connecticut Yankee Atomic Power Company

ATTN: Mr. W. G. Counsil

Senior Vice President - Nuclear

Engineering and Operations Group

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

Subject:

Inspection No. 50-213/82-18

This refers to the routine physical protection inspection conducted by Ms.

Lisa McKeown of this office on September 29 - October 1,1982, at the Haddam

Neck Nuclear Power Station of activities authorized by NRC License No. DPR-61

-

and to the discussions of our findings held by Miss McKeown with Mr. R. H.

Graves and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I

Inspection Report which is enclosed with this letter. Within these areas, the

inspection consisted of selective examinations of procedures and representa-

tive records, interviews with personnel, and observations by the inspector.

,

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within 10 days of the date of this letter and submit written

application to withhold information contained therein within 30 days of the

date of this letter.

Such application must be consistent with the require-

ments of 2.790(b)(1). The telephone notification of your intent to request

withholding, or any request for an extension of the 10-day period which you

believe necessary, should be nade to the Supervisor, Files, Mail and Records,

USNRC, Region I, at (215) 337-5223.

Your cooperation with us in this matter is appreciated.

Sincerely,

g ; :. Sic :d D

,

dwh

/A D

I

Thomas T. Martin, Director

Division of Engineering and Technical

Programs

-

Enclosure: NRC Region I Inspection Report Number 50-213/82- 18

,e

.

OFFICIAL RECORD COPY

[h

P212030165 821117

PDR ADOCK 05000213

G

PDR

l

i

o

.

'

~

17 N0'l 1982

Connecticut Yankee Atomic Power Co. 2

cc:

R. Graves,' Plant Superintendent

D. G. Diedrick, Manager of Quality Assurance

R. T. Laudenat, Manager, Generation Facilities Licensing

J. F. Opeka, Vice President, Nuclear Operations

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec:

Region I Docket Room (with concurrences)

Operational Support Staff (w/o encis)

Chief, RPS IB

C

RI:DETP

RI:DE

.TP

RI:

TP

McKeown/p a

God

'Joy r

TT . tin

j

7p

////A

11/8/82

.1

V

0FFICIAL RECORD COPY