ML20028B689
| ML20028B689 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 11/10/1982 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Gary R TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| Shared Package | |
| ML20028B690 | List: |
| References | |
| NUDOCS 8212030151 | |
| Download: ML20028B689 (2) | |
See also: IR 05000445/1982022
Text
0
It nq'S Filo Cep7
Docket:
50-445/82-22
NOV 101982
Texas Utilities Geneu ting Company
ATTN:
R. J. Gary, Execeive, Vice
President and' General Manager
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
This refers to the inspection conducted by Messrs. R. C. Stewart, D. P. Tomlinson
and Ms. M. J. Roberds of our staff during the period Octobcr 19-20, 1982, of
activities authorized by NRC Construction Permit CPPR-126 for the Comanche
Peak facility, Unit 1,' and to the discussion of our findings with Mr. R. G.
Tolson of your staff at the' conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with personnel, and observations by the inspectors.
'
t
Within the scope of the inspection, no violations or deviations were
identified.
Two new unresolved items are identified in paragraphs two and three of the
enclosed report.
i
In accordance with 10 CFR 2.790(a), e copy of this letter and the enclosure
l
will be placed in the NRC Public Doc uent .900m unless you notify this office,
l
by telephone, within 10 days of the date of this letter and submit written
application to witi. hold information contained therein within 30 days of the
!
date of this letter.
Such application must be consistent with the requirements
l
of 2.790(b)(1).
i
i
MO/
s
~
h
RP82
RPB1
DRRP&EfP f
RIV
GLMadsen JEGagVprdo
lins
WCSe}i
DPTom inson:gb DMHunnicutt
11/1/82
11/14/82
11/ /82
11/ /82 11/g82 11/s/p2
3
8212030151 821110
PDR ADOCK 05000445
O
~ _ - .
_
_
__
.
.
_
_ _ . . _ _ _
-
-
.
.
<
' '
i.
..
.
Texas Utilities Generating
2
Company
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
M
G. L. Madsen, Chief
,
Reactor Project Branch 1
Enclosure:
Appendix _ NRC Inspection Report 50-445/82-22
cc w/ enclosure:
Texas Utilities Generating Company
ATTN:
H. C. Schmidt, Project Manager
2001 Bryan Tower
Dallas, Texas 75201
bec to DM8:
IE01
bec to RIV:
RESIDENT
SECTION CHIEF
INFO SYSTEMS
t
RPB2
RPB1
RIV FILE
STATE
J. COLLINS
R. STEWART
M. ROBERDS
D.TOMLINSON
i
!
l
-w
y-wr
m
3
w
e
++r
.-
.- r
-
m--.-
--.wi,----r
p
-- - ,-+
=
w
-
- w