Forwards IE Insp Rept 50-255/82-26 on 821001-31.No Noncompliance Noted
ML20028B656
Person / Time
Site: Palisades 
Issue date: 11/17/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Dewitt R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
Shared Package
ML20028B657 List:
References
NUDOCS 8212030121
Download: ML20028B656 (2)


See also: IR 05000255/1982026

Text

r

.

.

-

NOV i 7 G82

Docket No. 50-255

Consumers Power Company

ATTN:

Mr. R. B. DeWitt

Vice President

'

Nuclear Operations

212 West Michigan Avenue

Jackson, MI 49201

Gentlemen:

,

This refers to the routine safety inspection conducted by Messrs.

B. L. Jorgensen ar.d J. K. Heller of this office on October 1-31, 1982,

of activities at the Palisades Nuclear Generating Plant authorized by

NRC Provisional Operating License No. DPR-20 and to the discussion of

our findings with Mr. R. W. Montross and others of your staff at the

conclusion of the inspection.

,

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

observations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request-for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished.

Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

which identifies the document or part sought to be withheld, and which

0212030121 821117

>

PDR ADOCK 05000255

sA

G

PDR

r'[V'

. __ _

.

.

_.

!

.

.

Consumers Power Company

2

NOV 1 7082

-

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). -The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit. If we do not hear from you in this regard within

i

the specified periods noted above, a copy of this letter and the enclosed

inspection report will be placed in the Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

')* a m. _

-

-

.

pn .

y f 3_- f '

- --

-

y

J. g Streeter, Chief

'

T.

Project Branch 2

Enclosure:

Inspection

Report No. 50-255/82-26(DPRP)

cc w/ enc 1:

D. J. VandeWalle, Nuclear

Licensing Administrator

R. W. Montross, Manager

DMB/ Document Control Desk (RIDS)

,

Resident Inspector, RIII

Ronald Callen, Michigan

Public Service Commission

1

4

RIII

RIII

RIII

n1\\h

j.

@Streeter

Holzmer/jp

Boyd

11/16/82

y ,/(f[f2.,

"41