Text
- _ - _ .
_
4,
Docket No. 50-336
Northeast Nuclear Energy Company
ATTN: Mr. W. G. Counsil
Senior Vice President - Nuclear
Engineering and Operations Group
P.O. Box 270
Hartford, Connecticut 06101
Gentlemen:
Subject: Inspection No. 50-336/82-23
This refers to the special inspection conducted by Dr. P. K. Eapen of this
office on October 19 - 21, 1982, at the Millsto,e Nuclear Power Station and at
your corporate office of activities authorized by NRC License No. DPR-65 and
to the discussions of our findings held by Dr. P. K. Eapen with Mr. J. J.
Kelley of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within 10 days of the date of this letter and submit written
application to withhold information contained therein within 30 days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1). The telephone notification of your intent to request withholding,
or any request for an extension of the 10-day period which you believe necessary,
should be made to the Supervisor, Files, Mail and Records, USNRC, Region I, at
(215) 337-5223.
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
M
original sicned sy j
d
.t.
'
~ &Thomas T. Martin, Director
Division of Engineering and
Technical Programs
Enclosure: NRC Region I Inspection Report Number 50-336/82-23
0FFICIAL RECORD COPY
8212030045 821119
e\\
PDR ADOCK 05000336
,
O
. -,
..
,
Northeast Nuclear Energy Company
2
cc w/ encl:
J. F. Opeka, Vice President, Nuclear Operations
E. J. Mroczka, Station Superintendent
D. G. Diedrick, Manager of Quality Assurance
R. T. Laudenat, Manager, Generation Facilities Licensing
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
State of Connecticut
bec w/ enc 1:
Region I Docket Room (with concurrences)
Operational Support Staff (w/o encl)
T. C. Elsasser
i
i
r
]
l
l
l
V Cp
RI:DETP
RI:DETP
DETP
l
Eapen/mjd
Bettenhausen
Ebneter
i
11/f/82
11/13/82
11/l7/82
f
0FFICIAL RECORD COPY