Text
. -- .
..
.
.-
__
~-
F
g
l
NOV 18 E62.
.
i
!
Docket No. 50-373
'
Docket No. 50-374
<
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. W. G. Guldemond,
A. Madison and D. Williams of this office on October 1-29, 1982, of activities at
LaSalle County Station, Units 1 and 2, authorized by NRC Operating License
No. NPF-11 and NRC Construction Permit No. CPPR-100 and to the discussion of our
findings with Mr. G. J. Diederich at the conclusion of the inspection.
,
The enclosed copy of our inspection report identifies areas examined during the
inspection. Within these areas, the inspection consisted of a selective examina-
tion of procedures and representative records, observations, and interviews with
personnel.
No items of noncompliance with NRC requirements were identified during the course
'
of this inspection.
In accordance with 10 CFR 2.790 of. the Commission's regulations, a copy of this
letter and the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or your con-
tractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is
necessary that you (a) notify this office by telephone within ten (10) days from
l
the date of this letter of your intention to file a request for withholding; and
(b) submit within twenty-five (25) days from the date of this letter a written
application to this office to withhold such information.
If your receipt of this
letter has been delayed such thct less than seven (7) days are available for your
review, please notify this office promptly so that a new due date may be estab-
lished. Consistent with Section 2.790(b)(1), any such application must be
,
accompanied by an affidavit executed by the owner of the information which
r
!
l
-,
i
t
0212030021
3
PDR ADGCK O O
set
a
.
.
-
-- .-
-
--
.
--
.
.
Commonwealth Edison Company
2
November 18,1932
identifies the document or part sought to be withheld, and which contains a full
statement of the reasons which are the bases for the claim that the information
should be withheld from public disclosure. This section further requires the
statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
as far as possible into a separate part of the affidavit.
If we do not hear from
you in this regard within the specified periods noted above, a copy of this
letter and the enclosed inspection report will be placed in the Public Document
Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
.
J. F. Streeter, Chic
Projects Branch 2
Enclosure:
Inspection Reports
No. 50-373/ b2-49(DPRP) and
No. 50-374/82-15(DPRP)
cc w/ enc 1:
Louis 0. De1 George, Director
of Nuclear Licensing
D. L. Shamblin, Site
Construction Superintendent
T. E. Quaka, Quality
Assurance Superintendent
G. J. Diederich, Station
Superintendent
R. H. Holyoak, Project Manager
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
RIII
RIII
RIII
?S
f h8!
$hYh')
Barrett/sv
Walker
Str//6,/9
eeter
11/17/82
///lf/'fA
//
4
l