Forwards IE Insp Repts 50-373/82-49 & 50-374/82-15 on 821001-29.No Noncompliance Noted
ML20028B551
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 11/18/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20028B552 List:
References
NUDOCS 8212030021
Download: ML20028B551 (2)


See also: IR 05000373/1982049

Text

. -- .

..

.

.-

__

~-

F

g

l

NOV 18 E62.

.

i

!

Docket No. 50-373

'

Docket No. 50-374

<

Commonwealth Edison Company

ATTN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. W. G. Guldemond,

A. Madison and D. Williams of this office on October 1-29, 1982, of activities at

LaSalle County Station, Units 1 and 2, authorized by NRC Operating License

No. NPF-11 and NRC Construction Permit No. CPPR-100 and to the discussion of our

findings with Mr. G. J. Diederich at the conclusion of the inspection.

,

The enclosed copy of our inspection report identifies areas examined during the

inspection. Within these areas, the inspection consisted of a selective examina-

tion of procedures and representative records, observations, and interviews with

personnel.

No items of noncompliance with NRC requirements were identified during the course

'

of this inspection.

In accordance with 10 CFR 2.790 of. the Commission's regulations, a copy of this

letter and the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or your con-

tractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is

necessary that you (a) notify this office by telephone within ten (10) days from

l

the date of this letter of your intention to file a request for withholding; and

(b) submit within twenty-five (25) days from the date of this letter a written

application to this office to withhold such information.

If your receipt of this

letter has been delayed such thct less than seven (7) days are available for your

review, please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must be

,

accompanied by an affidavit executed by the owner of the information which

r

!

l

-,

i

t

0212030021

3

PDR ADGCK O O

PDR

set

a

.

.

-

-- .-

-

--

.

--

.

.

Commonwealth Edison Company

2

November 18,1932

identifies the document or part sought to be withheld, and which contains a full

statement of the reasons which are the bases for the claim that the information

should be withheld from public disclosure. This section further requires the

statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not hear from

you in this regard within the specified periods noted above, a copy of this

letter and the enclosed inspection report will be placed in the Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

.

J. F. Streeter, Chic

Projects Branch 2

Enclosure:

Inspection Reports

No. 50-373/ b2-49(DPRP) and

No. 50-374/82-15(DPRP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

D. L. Shamblin, Site

Construction Superintendent

T. E. Quaka, Quality

Assurance Superintendent

G. J. Diederich, Station

Superintendent

R. H. Holyoak, Project Manager

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII

Karen Borgstadt, Office of

Assistant Attorney General

RIII

RIII

RIII

?S

f h8!

$hYh')

Barrett/sv

Walker

Str//6,/9

eeter

11/17/82

///lf/'fA

//

4

l