ML20028B448

From kanterella
Jump to navigation Jump to search
Confirms 820908 Telcon Request to Extend Response Date to IE Insp Rept 50-341/82-10 to 821023
ML20028B448
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/09/1982
From: Wells D
DETROIT EDISON CO.
To: Norelius C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML20028B412 List:
References
EF2-59394, NUDOCS 8211300392
Download: ML20028B448 (1)


Text

'

Donald A. Wells vamp QuaMy Avaanco (313) 23/ W)7 Edison E##inim>-

September 9, 1982 EF2-59394 Mr. C.E. Norelius, Director Division of Engineering and Technical Programs U.S. Nuclear Regulatory Cmmission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

NRC Inspection 50-341/82-10 Response Date

Dear Mr. Norelius:

This letter confirms the telephone conversation between Mr. D. Ferencz, Edison OA representative and Mr. J.E. Konklin of your organization on September 8,1982 pertaining to a request to extend the response date to the NRC Inspection Report No. 50-341/82-10 (DM'P) . The request was made because of the relatively large number of items (24) requiring a written response. During the conversation, Mr. Konklin agreed to extend the due date for an additional 30 days. Thereforu, the revised date is October 23, 1982.

Very tmly you ,

q ,

DAW /DF/cp cc: Mr. Richard DeYoung, Director Office of Inspection & Enforcenent Division of Reactor Inspection Programs Washington, D.C. 20555 Mr. Bruce H. Little, Resident Inspector U.S. Nuclear Regulatory Cmmission Mr. J.E. Konklin, Chief Projects Section 2A U.S. Nuclear Regulatory Cmmission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 8211300392 821123 '

PDR ADOCK 05000341 O gp* 17 btfd PDR i