Text

'

h) cop #

i ~

i UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION 1

'82 kW 29 pg :29 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD

Gri:sv In the Matter of ) kff ill!!'hf 2

)

DUKE POWER COMPANY, et al. ) Docket Nos. 50-413

) 50-414

, (Catawba Nuclear Station, )

Units 1 and 2) )

APPLICANTS' SUPPLEMENTAL RESPONSES TO " PALMETTO ALLIANCE THIRD SET OF INTERROGATORIES AND REQUESTS TO PRODUCE" Duke Power Company, et al. (Applicants) , pursuant to 10 CFR

2. 74 0b (b) , hereby supplement their October 19, 1982 Responses to

" Palmetto Alliance Third Set of Interrogatories." As indicated in their October 19 Responses, Applicants stated that they would provide responses to Interrogatories 14 and 15 and a portion of Interrogatory 32 at a later date. This Supplemental Response incorporates by reference all objections contained in the October 19 Responses, as well as Applicants' Motion for Protective Order of

! the same date which accompanied those Responses.

i L Specific Interrogatories i

14. Discuss in detail the " pool leakage rate." FSAR 9.1.2.1 (8)

Include in your answer all assumptions, computations, and calculations used in determining this rate.

The " pool leakage rate" discussed in FSAR 9.1.2.1(8) is a maximum credible value calculated to insure that each redundant make-up system provided has the capacity to supply water at an adequate rate for Condition I, II, III and IV occurrences.

4 l The spent fuel pool liner plate is designed and tested for a l .

l l

~

s211300362 sai122 PDR ADOCK 05000413 9 PDR gh)} C

O zero " pool leakage rate." Since the spent fuel pool facility (including the liner plate) is analyzed and designed as a ..

Seismic Category I structure and a safety evaluation (FSAR 9.1.2.3) concludes that the liner plate can withstand all credible loading combinations and impacts without loss of integrity, the " pool leakage rate" referenced in FSAR 9.1.2.1(8) remains as designated (equal to zero). Although no leakage is postulated, an assured source of make-up water is provided by connections to the Nuclear Service Water System as discussed in FSAR Section 9.1.3.1-4. (JRT)

15. Describe in detail the environmental, health, and safety effects if the pool leakage rate is greater than anticipated.

Since the pool liner plate is designed and tested to zero leakage for all Condition I, II, III or IV occurrences (refer to response for Interrogatory 14), environmental, health, or safety effects due to pool leakage have not been evaluated. (JRT)

32. Describe in detail the tests performed on the spent fuel storage racks in the shop after fabrication and in the spent fuel pool to insure that there are no drag forces in excess of 50 pounds during removal of fuel assemblies from storage racks. FSAR 9.1.2.3 How was the figure of 50 pounds determined? Vmy was this figure used as a cut-

! off? Include all assumptions, calculations and computations utilized.

Fifty pounds is the approximate amount of drag force expected.

! The design specification has evolved over time, based on observa-tion and experience. Known good fuel assemblies and known good racks have been studied and drag forces of about fifty pounds -

have been observed. (RWO) .I

We are supplying the Affidavit of R. G. Snipes, which was inadvertently omitted from the October 19 Responses.

Respectfully submitted, William terry P~ rter -

Albert V. Carr, Jr.

DUKE POWER CO ANY P. O. Box 33189 Charlotte, North Carolina 28242 (704) 373-2570 J. Michael McGarry, III Anne W. Cottingham DEBEVOISE & LIBERMAN 1200 Seventeenth Street, N.W.

Washington, D. C. 20036 November 22, 1982 I

i 1

~

001,HETED

'nh=C UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

  • 82 Ngy 29 A8 :30 BEFORE THE ATOMIC SAFETY AND LICENSING BOARD ,ij[.g. :I ; ,

BRAtlCH "__. . . . - .

In the Matter of )

)

DUKE POWER COMPANY, et al. ) Docket Nos. 50-413 50-414 (Catawba Nuclear Station, 1 Units 1 and 2) )

AFFIDAVIT I, James-R. Thornton, being duly sworn, hereby state that I am employed by Duke Power Company as an Engineer Assistant, Design Engineering Department.

I have been responsible for furnishing the basic infonnation used in responding to those Interrogatories on Palmetto Alliance Contention 16 by which my initials appear. Those responses are true and correct to the best of my knowledge and belief.

T mb W Subscribed and sworn to before me this // 9 day of November, 1982.

<f 1 A d d $ 4 4b'MfbJ Notag'Public' My Commission expires: /- l b 8

00f.KETED UNITED STATES OF AMERICA 'M NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD 82 NOV 29 A8:30

'. F F ' J.. 2" SEGRETAh Y DCC!'.Eiir G & SERVICE BRANCH In the Matter of )

)

DUKE POWER COMPANY, el al. ) Docket Nos. 50-413

) 50-414 (Catawba Nuclear Station, )

Units 1 and 2) )

AFFIDAVIT I, R. G. Snipes, being duly sworn, hereby state that I am employed by Duke Power. Company as Systems Engineer, Nuclear Production Department.

I have been responsible for furnishing the basic information used in responding to those Interrogatories on Palmetto Alliance Contention 16 by which my initials appear. Those responses are true and correct to the best of my knowledge and belief.

R. G. Snipes Subscribed and sworn to before me this J'id day of October,1982

, CD ~

C cL/)

Notary Public My Commissico Expires:

/9 9/

,c hu; ho c4 - -

t

UNITED STATES OF AMERICA 9$~ _EI NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD *82 EV 29 e a In the Matter of )  ; 1 uchdis

)

E.GC.tuit.c ; 3ggygg.v u e BRAncy. '

DUKE POWER COMPANY, et al.

) Docket Nos. 50-413

) 50-414 (Catawba Nuclear Station, )

Units 1 and 2) )

CERTIFICATE OF SERVICE I hereby certify that copies of " Applicants' Supplemental Responses to ' Palmetto Alliance Third Set of Interrogatories and Requests to Produce'" in the above-captioned matter have been served upon the following by deposit in the United States mail this 22nd day of November, 1982:

James L. Kelley, Chairman J. Michael McGarry, III, Esq.

Atomic Safety and Licensing Debevoise & Liberman Board Panel 1200 Seventeenth Street, N.W.

U. S. Nuclear Regulatory Washington, D. C. 20036 Commission Washington, D. C. 20555 Richard P. Wilson, Esq.

Assistant Attorney General Dr. A. Dixon Callihan State of South Carolina Union Carbide Corporation P. O. Box 11549 P. O. Box Y Columbia, South Carolina 29211 Oak Ridge, Tennessee 37830 Robert Guild, Esq.

Dr. Richard F. Foster Attorney-at-Law P. O. Box 4263 P. O. Box 12097 Sunriver, Oregon 97702 Charleston, Sodth Carolina 29412 Chairman Chairman Atomic Safety and Licensing Atomic Safety and Licensing Appeal Board Panel Board U. S. Nuclear Regulatory U. S. Nuclear Regulatory Commission Commission Washington, D. C. 20555 Washington, D. C. 20555 Mr. Jesse L. Riley George E. Johnson, Esq. 854 Henley Place Office of the Executive Legal Charlotte, North Carolina 28207 i

Director U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Mr. Henry A. Presler 945 Henley Place '

Charlotte, North Carolina 28207 Palmetto Alliance 2135 Devine Street Columbia, South Carolina 29205 Mr. Scott Stucky Docketing and Service Section U. S. Nuclear Regulatory Commission Washington, D. C. 20555 s

Albert V. rr, Jr. '

'- h s, .

s

, b1 I

y e