ML20028B318
| ML20028B318 | |
| Person / Time | |
|---|---|
| Site: | Midland |
| Issue date: | 11/23/1982 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Miller D CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| References | |
| NUDOCS 8211300283 | |
| Download: ML20028B318 (2) | |
Text
E A
November 23, 1982 Docket No. 50-329 Dodtet No. 50-330 Mr. D. B. Miller
~
Site Manager P.O. Box 1963 Midland, MI 48640 Beforence:
Letter dated October 22, 1982, to D. E. Miller from W. D. Shafer, Chief, Midland Section
Dear Mr. Miller,
The above referenced letter discusses when revisions to Quality Assurance Plans MPQP-1 and MPQP-2 will require prior Region III authorization.
2he Board has requested that we clarify our stat===at that organizational changes could be implemented without prior regional approval.
The types of organization changes that will not require prior regional authorization are typographical corrections or title changes that do not include a reassignment of responsibility.
Changes to the organizational structure, reassirfa= mat of responsibility and changes to the intent of the plan (which includes the organization charts) will require prior Region III authorization.
Should you have any questions regarding this letter, please feel free to contact me.
t W. D. Shaf I
Chief Midland Section cc: See Attached List 4
3 G
0 pd/
A 1
orncry ocu p NRC FORM 318 00 80) NRCM O240 OFFICIAL RECORD COPY
D. B. Miller cc DMR/ Document Control Desk (RIDS)
Hesident Inspector, RIII The Honorable Charles 3echhoefer, ASLB The Honorable Jerry Harbour, ASLB The Honorable Frederick P. Cowan, ASLB The Honorable Ralph S. Decker, ASLB Michael Miller norald Callen, Michigan Public Service Commisalon Myron M. Cherry Barbara Stamiris Wary Sinclair Wendell Marshall Colonol Steve J. Gadler (P.E.)
mer >
RIII SURNAME)..S h
..c....
c o^Tr >
- 1..., !).3. / 8 2..
nac ronu iis oo-so, unc" **
OFFICIAL RECORD COPY
.