ML20028B021
| ML20028B021 | |
| Person / Time | |
|---|---|
| Site: | Vermont Yankee File:NorthStar Vermont Yankee icon.png |
| Issue date: | 11/09/1982 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Murphy W VERMONT YANKEE NUCLEAR POWER CORP. |
| Shared Package | |
| ML20028B022 | List: |
| References | |
| NUDOCS 8211290376 | |
| Download: ML20028B021 (2) | |
See also: IR 05000271/1982020
Text
-
..
O
.
My
3 1982
Docket No. 50-271
Vermont Yankee Nuclear Power Corporation
ATTN: Mr. Warren P. Murphy
Vice President and Manager of Operations
RD 5, Box 169
Ferry Road
Brattleboro, Vermont 05301
Gentlemen:
,
Subject:
Inspection No. 50-271/82-20
This refers to the routine safety inspection conducted by C. Rowe of this
office on September 20-24, 1982, of activities authorized by NRC License No.
DPR-28 and to the discussions of our findings held by Mr. Rowe with M. Lyster
and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I Inspection
Report which is enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, measurements made by the inspector, and
observations by the inspector.
Our inspector also verified the steps you have taken to correct the violation
brought to your attention in the enclosure to our letter dated March 23, 1982.
We have no further questions regarding your action at this time.
Within the scope of this inspection, no violations were observed.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
will be placed in the NRC Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of
,
the date of this letter. .Such application must be consistent with the require-
ments of 2.790(b)(1).
The telephone notification of your intent to request
withholding, or any request for an extension of the 10 day period which you
l
believe necessary, should be made to the Supervisor, Files, Mail and Records,
l
USNRC Region I, at (215) 337-5223.
l
l
l
I
8211290376 821109
-
f
O b
.
{DRADOCK 05000271
l
q [-
l
,
._ _
_
__
. .
.
.
MY 0 1982
Vermont Yankee Nuclear Power Corporation 2
No reply to this letter is required. Your cooperation with us in this matter
is appreciated.
Sincerely,
@Rdd Mih
Ber+ T. 3-
Thomas T. Martin, Director
Division of Engineering and Technical
Programs
Enclosure:
NRC Region I Inspection Report Number 50-271/82-20
cc w/ encl:
Mr. J. B. Sinclair, Licensing Engineer
Mr. W. F. Conway, President and Chief Executive Officer
Mr. J. P. Pelletier, Plant Manager
Mr. L. H. Heider, Vice President
Public Document Room (POR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
N!
Resident Inspector
St.'e of New Hampshire
State of Vermont
bec w/ enc 1:
Region I Docket Room (with concurrences)
Chief, Operational Support Section (w/o encls)
Chief, Reactor Project Section # , DPRP
RI:DETP
RI:DETP
RI:
R: TP
<d , d
Ma
Rowe/1p
Gre nman
in
I
10/29/82
/4U
/
OFFICIAL RECORD COPY
p
--
-
..
--
--