ML20028B021

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-271/82-20 on 820920-24.No Noncompliance Noted
ML20028B021
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 11/09/1982
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20028B022 List:
References
NUDOCS 8211290376
Download: ML20028B021 (2)


See also: IR 05000271/1982020

Text

-

..

O

.

My

3 1982

Docket No. 50-271

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President and Manager of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

,

Subject:

Inspection No. 50-271/82-20

This refers to the routine safety inspection conducted by C. Rowe of this

office on September 20-24, 1982, of activities authorized by NRC License No.

DPR-28 and to the discussions of our findings held by Mr. Rowe with M. Lyster

and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the NRC Region I Inspection

Report which is enclosed with this letter. Within these areas, the inspection

consisted of selective examinations of procedures and representative records,

interviews with personnel, measurements made by the inspector, and

observations by the inspector.

Our inspector also verified the steps you have taken to correct the violation

brought to your attention in the enclosure to our letter dated March 23, 1982.

We have no further questions regarding your action at this time.

Within the scope of this inspection, no violations were observed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of

,

the date of this letter. .Such application must be consistent with the require-

ments of 2.790(b)(1).

The telephone notification of your intent to request

withholding, or any request for an extension of the 10 day period which you

l

believe necessary, should be made to the Supervisor, Files, Mail and Records,

l

USNRC Region I, at (215) 337-5223.

l

l

l

I

8211290376 821109

-

f

O b

.

{DRADOCK 05000271

l

q [-

PDR

l

,

._ _

_

__

. .

.

.

MY 0 1982

Vermont Yankee Nuclear Power Corporation 2

No reply to this letter is required. Your cooperation with us in this matter

is appreciated.

Sincerely,

@Rdd Mih

Ber+ T. 3-

Thomas T. Martin, Director

Division of Engineering and Technical

Programs

Enclosure:

NRC Region I Inspection Report Number 50-271/82-20

cc w/ encl:

Mr. J. B. Sinclair, Licensing Engineer

Mr. W. F. Conway, President and Chief Executive Officer

Mr. J. P. Pelletier, Plant Manager

Mr. L. H. Heider, Vice President

Public Document Room (POR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

N!

Resident Inspector

St.'e of New Hampshire

State of Vermont

bec w/ enc 1:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encls)

Chief, Reactor Project Section # , DPRP

RI:DETP

RI:DETP

RI:

R: TP

<d , d

Ma

Rowe/1p

Gre nman

in

I

10/29/82

/4U

/

OFFICIAL RECORD COPY

p

--

-

..

--

--