ML20028A919
| ML20028A919 | |
| Person / Time | |
|---|---|
| Site: | Palisades |
| Issue date: | 11/04/1982 |
| From: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC |
| Shared Package | |
| ML18047A673 | List: |
| References | |
| NUDOCS 8211290211 | |
| Download: ML20028A919 (1) | |
Text
-
9~ 4 RECORDS CONTROL FORM -
Date U /h/Ao DIERGENCY IMPLE!ENTATION PROCEDURES
- 1) G.O. DCC
- 11) Power Control n.u.unLuKaTAEd 39 41) oper. Support
- 2) Plant Manager
- 12) Maint. Supt.
223XZMEff'OCsTdrdhT4
- 42) US NRC
- 3) Control Roem
- 13) Oper. Supt.
2ItomnIZXITriHrdhT4 h3) G.O. DCC h) Che=/HP Office 1b) E=er. Kit /CR 2h) Op/Maint. Supt.
hk) G.O. DCC
- 5) Chem /HP Office 15) E=er. Kit /SS
- 25) Security Office
'h5) Emer. Operations
- 6) Training
- 16) Emer. Kit / Training 26) NRC-JGKeppler Facility -KJRidley
- 7) Master File
- 17) W'4111er
- 27) NRC-JGKeppler h6) US NRC-Washingtor
- 8) WMHodge
- 18) Rad Pro Office
- 28) Shift Technical Adv. h ) Neu M&g-M 7
- 9) RWSinderman 12iXMx:cacccont1YxI
- 29) RADeLong
- 48) CBSnov
- 10) Shift Supv.
R2tCD:KXXKyrgimnr 30-38)iTech. Support Notice of Nev/ Revised Revision 3 Number (s)
EI h.2 Operational Support Center Activation Title PALISADES PLANT EMERGENCY DIPLE'IENTATION PROCEDURES I have received the above document (.s) and have destroyed all previous issues, or as dalineated below.
1.
RDt0VE AND DESTROY:
REPLACE WITH:
EI h.2, R/2 EI-h.2, R/3 2.
Please sign, date and return this form to Palisades Plant Document Control.
t l
ypod
~
=;;;;;;36 021:09-g
" 2 00;' 0 00 0 0 2""5 4
Palisades Plant Return to: Document Control Signature or Initials File:
~QA-02 Book Date j 'q, )
PDR ADOCK 05000255
-M' ' ~~ e 8211290211 021119 l-F PDR
'