ML20028A919

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revision 3 to Emergency Plan Implementing Procedure EI-4.2, Operational Support Ctr Activation. Receipt Form Encl
ML20028A919
Person / Time
Site: Palisades Entergy icon.png
Issue date: 11/04/1982
From:
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC
Shared Package
ML18047A673 List:
References
NUDOCS 8211290211
Download: ML20028A919 (1)


Text

-

  • RECORDS CONTROL FORM -

9~ 4Date U /h/Ao DIERGENCY IMPLE!ENTATION PROCEDURES

1) G.O. DCC 11) Power Control n.u.unLuKaTAEd 39 41) oper. Support
2) Plant Manager 12) Maint. Supt. 223XZMEff'OCsTdrdhT4 42) US NRC
3) Control Roem 13) Oper. Supt. 2ItomnIZXITriHrdhT4 h3) G.O. DCC h) Che=/HP Office 1b) E=er. Kit /CR 2h) Op/Maint. Supt. hk) G.O. DCC .
5) Chem /HP Office 15) E=er. Kit /SS 25) Security Office 'h5) Emer. Operations
6) Training 16) Emer. Kit / Training 26) NRC-JGKeppler Facility -KJRidley
7) Master File 17) W'4111er 27) NRC-JGKeppler h6) US NRC- Washingtor
8) WMHodge 18) Rad Pro Office 28) Shift Technical Adv. h7 ) Neu M&g-M
9) RWSinderman 12iXMx:cacccont1YxI 29) RADeLong
10) Shift Supv. R2tCD:KXXKyrgimnr 30-38)iTech. Support 48) CBSnov Notice of Nev/ Revised Revision 3 Number (s) EI h.2 Operational Support Center Activation Title PALISADES PLANT EMERGENCY DIPLE'IENTATION PROCEDURES I have received the above document (.s) and have destroyed all previous issues, or as dalineated below.
1. RDt0VE AND DESTROY: REPLACE WITH:

EI h.2, R/2 EI-h.2, R/3

2. Please sign, date and return this form to Palisades Plant Document Control.

t l

~

ypod

=;;;;;;36 021:09-g " 2 00;' 0 00 0 0 2""5 4

Palisades Plant Return to: Document Control Signature or Initials File: ~QA-02 Book ..

Date j 'q , )

8211290211 021119 -

-M' ' l-

~~ e PDR ADOCK 05000255 '

F PDR