ML20028A466

From kanterella
Jump to navigation Jump to search
RO 369/82-74:rept Due on 821112 Will Be Issued by 821130 Due to Incomplete Investigation of Containment Air Lock Failure
ML20028A466
Person / Time
Site: McGuire 
Issue date: 11/11/1982
From: Tucker H
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
RO-369-82-74, NUDOCS 8211220199
Download: ML20028A466 (1)


Text

DUKE POWER GOMPANY v.o. nox aamo CHAMLoTTE, N.C. 23242 HALH. TUCKER TELEPHONE (70-4) 3MMi vu r.r.rne=v

,mu.

-a,a.

.s

'O

's.

4 November 11, 1982 2

a s~

I aa 2* m Mr. James P. O'Reilly, Regional Administrator c;Q U. S. Nuclear Regulatory Commission p

VJ"hj 3

Region II iE5 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 s

h Re: McGuire Nuclear Station Unit 1 Docket No. 50-369

Dear Mr. O'Reilly:

Reportable Occurrence Report R0-369/82-74 was to have been submitted by November 12, 1982. This 30 day reportable occurrence (pursuant to T.S.6.9.1.13) concerns T.S.3.6.1.3, "Each containment air lock shall be operable...", which was violated on October 14, 1982. However, the investigation of this incident and preparation of a report are incomplete at this time. The report will now be submitted by November 30, 1982.

Very truly yours, fb L

/gg Hal B. Tucker PBN/jfw

\\

cc: Document Control Desk INPO Records Center U. S. Nuclear Regulatory Commission Suite 1500 l

Washington, D. C.

20555 1100 Circle 75 Parkway I

Atlanta, Georgia 30339 Mr. P. R. Bemis Senior Resident Inspector McGuire Nuclear Station s#;(Opi p

. _, ~

8211220199 821111 PDR ADOCK 05000369 S

PDR