ML20028A421

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Oct 1982
ML20028A421
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 11/15/1982
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
Shared Package
ML20028A422 List:
References
NUDOCS 8211220121
Download: ML20028A421 (1)


Text

Mailing Address Alabama Power Company 603 North 18th Street Post Office Box 2641 Birmingham. Alabama 35291 Telephone 205 783-6081 F. L Clayton, Jr.

RafiJM**4*"'

AlabamaPbwer the Southem electnC System November 15, 1982 Docket No. 50-364 Director, Office of Management Information and Program Control U. S.

Nuclear Regulatory Commission Washington, D.C.

20555

Dear Si r:

RE: Joseph M. Farley Nuclear Plant Unit 2 Monthly Operating Data Report Attached are two (2) copies of the October, 1982 Monthly Operating Report for Joseph M.

Fa rley Nuclear Plant, Unit 2, required by Section 6.9.1.10 of the Unit 2 Technical Specifications.

As requested by letter from Mr. John F.

Stolz to Mr. Alan R. Barton, dated October 21, 1977, a "Narra-tive Summary of Operating Experience" is included in the attached report.

If you have any questions, please advise.

Yours very ru y, I

J k-t

/)N. L. Cl a y t o n, Jr.

F FLCJr/KWM:nac Enclosures xc: Mr. Ted Cintula (1 copy)

Director, IE (10 copies)

Director, RII (1 copy)

IgOk 8211220121 821115 PDR ADOCK 05000364 R

PDR

.- -