ML20028A415

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-397/82-23 on 820901-30.No Noncompliance Noted
ML20028A415
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 11/01/1982
From: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Matlock R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20028A416 List:
References
NUDOCS 8211220105
Download: ML20028A415 (2)


See also: IR 05000397/1982023

Text

.

.

<

  • f

-

-

0, -

-

~

NOV 1 1982

Docket No. 50-397

Washington Public Fower Supply System

P. O. Box 968

Richland Washington 993.52

Attention:

Mr. R. G. Matlock

Program Director

Gentlemen:

l

l

Subject:

NRC Inspection

This refers to tne routine, monthly inspection conducted by

Messrs. A. D. Toth and R. A. Feil of this office, during

September 1-30. 1982, of activities authorized by NRC Con-

struction Permit No. CPPR-93, and to the discussion of findings

i

held by Messrs. Toth and Feil with Messrs. C. Carlisle and

R. Johnson at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records,

int.arvi ns uith personnel, and observations by the inspectors.

lio items of noncompliance with NRC requirements were identified

within the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information con-

tained therein within thirty days of the date of this letter.

Such

application must be consistent with the requirements of 2.790(b)(1) .

p

.

eat 1220tos eattot

PDR ADOCK 05000397

gt>

G

PDR

/

.av.g ....g...

... ..

... .

Q G .S....

....... ...... ......

.....................

.......... .......

= = >

,,,,,,,,,,,,,,,,,,..

"""4

R. . , , , , ,e.i , , , , , , , ,R ., , , , , , , ,d s , , , , }f,, St,p,mb, erg,,,,,,,,,,,,,,,,,,,,,

,,,,,,,,,,,,,,,,,,,

A . J .. . L ...

,, i

""> .w.Y/.aa.. 1.0.g,ff82..... 1 0 n g .2...

.. 19.g L82

..................{

. ...

,,..,.. ,, ,,,,,,.

. . . . . . . . . . . . . . . .

NRC FORM 3I8 410 801 NRCM O240

OFFICIAL RECOFiD COPY

' " "-32"2* l

fi

h.

T

-

k'ashington Public Power Supply System -2-

fiOV 1 1982

i

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

D. M. Stcrnberg, Chief

Reactor Projects Branch No.1

Enclosure:

NRC Inspection Report

he. 50-397/82-23

cc w/ enclosure:

R.

B. Glasscock, Licensing and Quality Assurance Director

bcc: DMB/ Document Control Desk (RIDS)

Distributed by RV:

State of WA (Lewis)

Resident Inspector

RHE (w/o enc)

i

j

l

l

l J