JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS October, 1982 l
In the month of October there were two (2) unit shutdowns.
The following safety-related maintenance was performed in the month of October:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Replaced Reactor Coolant System Sample Valve V-23 with new valve.
- 3. Replaced Reactor Coolant. System Post Accident Sample System liquid sample spout.
- 4. Pumped sludge from the bottom of the //l Recycle Holdup Tank.
1 i
I e
1 8211220010 821115 PDR ADOCK 05000348 R
1 OPERATING DATA REPORT DOCKET NO. 50-348
,I DATE 11/04/82 COMPLETED BY W.G.llairston, III e
TELEPflONE (205)899-5156 I
OPERATING STATUS I. Unit Name:
Joseph M. Farley - Unit 1 Notes
- 2. Reporting Period:
October, 1982
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2652 12/01/77, date of.
- 4. Nameplate Rating (Gross MWe):
edl geWom
- 5. Design Electrical Rating (Net MWe):
829
- 6. Masimum Dependable Capacity (Gross MWe):
844.6
- 7. Masimum Dependable Capacity (Net MWe):
803.6
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Lesel To Which Restricted,If Any(Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
N/A This Month Yr.-to Date Cumulatis e I1. Ilours in Reporting Period 745 7,296 43,104*
- 12. Number Of flours Reactor Was Critical 727 5,709.2 26,691
- 13. Reactor Reserve Shutdown llours 18 122.5 3,614.5_
- 14. Ilours Generator On.Line 708.2 5,487.3 25,817 II. Unit Reserve Shuidown flours O
O O
- 16. Gross Thermal Energy Generated (MWil)
E L10.147 13,779,051 64,723,962
- 17. Gross f!rctrical Energy Generated (MWil) 539 434_ _,
4,334,240 20,571,192
- 18. Net Electrical Energy Generated (MWil) 508.982 4.075,094 19,298,818
- 19. Unit Senice Factor 95.1 75,2 59.9
- 20. Unit Asailability Factor 95.1 75.2 59.9
- 21. Unit Capacity Factor (Using MDC Net) 85.0 69.5 55.7 1
22 Unit Capacity Factor (Using DER Net) 82.4 67.4 54.0
- 23. Unit Forced Outage Rate 4.9 24.5 19.0
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each3:
Refueling Outage; January 15, 1983; Approximately 11 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in lest Status (Prior io Commercial Operation):
Forecast Achiesed INIIIA L CRH ICAtli y 8/06/77 8/09/77 INITI AL El.l:C1RICIIY 8/20/77 8/18/77 COMMERCI A L OPER A llON 12/01/77 12/01/77
/
(9/77)
UfX.ht'l NO.
50-348 s
UNIT ;T.M.Farlev-Unit 1 DAlt 11/04/82 COMI'LETED tlY W.G.Hairston, III 1ELifl!ONE (205)899-5156 October McN111 DAY AVElt \\GE Il\\ll.Y l'Oh Eit LEVEL '
DAY AVER AGE IMILY l'0WEli L EVEL (Mhe Net)
(MWe Net) 801 17 809 g
802 1:;
410 2
t 802 19 106 3
4 20 395 793 790 73 781 5
791 806 6
22 794 23 380 7
792
- .5 79 Qg 793 25 363 9
552 794 26 10 796 n
582
- i; 795 742 12 3
13 795
- 9 806 g.;
30 808 802 807 806 15 3:
16 805 9
INS TittJCllONS
. n t!us I.irmir. liu u.* 2sange daily umt powe-level in MWe Net for each d:y in the reporting irainth. Connpute to
, the nesse t wl.ule nr.,'sa t r
G O
1
UNIT SilUlDOWNS AND POWER REDUCI10NS DOCKET NO.
50-348 I
UNIT NAME J. M. Farlev-Unit 1.
DATE 11/04/82 l
REPORT MONTil OCTOBER, 1982 COMPLETED llY W.G. Hairston, III l
TEl.EPif0NE (205) 899-5156 l
w.
6 'L Cause & Cosrective c
rs 3 sa :
E '.4 Licensee Sv.
~.,
.E e 8
g g'
No.
Date g
gg jgj Event u?
o-3 Action to
$5 5
j5g Repori #
ju
$0 p,,,,,,g,c,,,,,c, 6
009 821018 F
14.8 G
3 NA CH PUMPX'(
. Reactor trip due to an inadvertent manual trip of the 1A feedwater pump.
A subsequent reactor trip occurred due to low steam generator level.
010 821023 F
22.0 G
3 NA EB INSTRU While adjusting the voltage regulator a generator trip occurred due to under-excitation of the main generator.
Prior to returning the unit to service two reactor trips occurred due to low steam generator level.
I 2
3 4
F: Forced Reason:
Method:
Exhibit G. instructions S: Stheduled A Equipment Failure (Explain) 1 -Manual for Pseparation of Daia H. Maintenance ci Test 2 Manual Scram.
Enuy Sheels for l_icensee C Refuehag 3 Automatic Scram.
Event Repos (1.ER) FileINUREG.
D Regulatosy Resitiction 4-Other (Explaio) 0161)
E-Operator Training & license Examination F Administsative 5
G Opesational Enor (Explain)
Exhibit ! Same Source P7/77) 11 Othes (Explain)
e i
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE
SUMMARY
OF OPERATIONS October, 1982 In the month of October there were two (2) unit shutdowns.
The following safety-related maintenance was performed in the month of October:
- 1. Performed miscellaneous maintenance on diesel generators.
- 2. Replaced Reactor Coolant System Sample Valve V-23 with new valve.
- 3. Replaced Reactor Coolant System Post Accident Sample System liquid sample spout.
- 4. Pumped sludge from the bottom of the #1 Recycle Holdup Tank.
If i
ol I
OPERATING DATA REPORT 50-348 I
DOCKET NO DATE 11/04/82
,l COMPLETED BY W.G.Hairston, III TELEPil0NE (205)899-5156 e
i I'
OPERATING STATUS Notes Joseph M. Farley - Unit 1
- f. Unit Na.ne:
October, 1982
- 1) Cumulative data since
- 2. Reporting Period:
12/01/77, date of.
2652
- 3. Licensed Thennal Power (MWil:
c mmercial operation.
860
- 4. Nameplate Rating (Gross MWe):
829
- 5. Design Electrical Rating (Net MWe):
844.6
- 6. Masimum Dependable Capacity (Gross MWe):
803.6 I
- 7. Masimum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:
N/A N/A
- 9. Power Lesel To Which Restricted,If Any (Net MWe):
N/A
- 10. Reasons For Restrictions.lf Any:
i t
This Month Yr.-to.Dat e Cumulathe
- 11. Ilours in Reporting Period 745 7,296 43,104-727 5,709.2 26,691
- 12. Number Of 11ours Reactor Was Critical 18 122.5 3,614.5
- 13. Reactor Resene Shutdown Hours 708.2 5,487.3 25,817
- 14. Ilours Generator On.Line 0
0 0
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1.710.147 13.779.051 64,723,962 539 634 4,334,240 20,571,192
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MhH) 508.982 4.075.094 19,298,818
- 19. Unit Senice Factor 95_1 75.2 59.9 95.1 75.2 59.9
- 20. Unit Availability Factor 85.0 69.5 55.7
- 21. Unit Capacity Factor (Using MDC Net) 82.4 67.4 54.0 l
- 22. Unit Capacity Factor (Using DER Net) 4.9 24.5 19.0
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months iType. Date.and Duration of Eacht:
Refueling Outage; January 15, 1983; Approximately 11 weeks N/A
- 25. If Shut Down At End Of Report Period.1%timated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achiesed t
8/06/77 8/09/77 INITIA L CRITICALITv INITIAL ELEClRICITY 8/20/77 8/18/77 COMMERCIAL OPER ATION 12/01/77 12/01/77 "q
(9/77 )
DOCKL'l.*iO.
_50-348 UNIT J.M.Farlev-Unit 1 DA1E __1_1/04/82 CO.\\fPLETED 13y W.C.Hairston, III
/
1ELEPl!ONE (205)899-5156 October
.t!Offill DAY AVElt.\\GI' DAILY l't)hEit LEVEL DAY AVEl(AGE D \\ll't' POWEli LEVEL.
(.\\lwe ties) t,.11.e Net) 801 17 809 g,
802 13 410 2
802 19 106 3
395 793 2g
.g 781
_790 21 5
806 791 22 6
380 794 23 7
s, 792 79 g
363 793 23 7
~
552 794 X
10 582
'gg 796
- 7 742 795
,a 12 806 795
- 9 13 808 802 30 1.t 806
~
807 33 g5 805 16 INSiitUC110NS On this formit. list the stense daily umt power ! ciel us ?.lWe Net for each day en the repotimg namth. Compute to
, the nesse: whole ne;r att.
p(77) i q
a
UNIT SilUlDOWNS AND POWER REDUCTIONS DOCKET NO.
50-348 UNIT NAME J. M. Farlev-Unit 1 '
DATE 11/04/82 REPORT MONTil OCTOBER, 1982 COMPLETED BY W.G. llairston, III TE! LPHONE (205) 899-5156 w.
c c
e.
3:sX Licenwe P.,
c *.,
Cause & Coareceive L
.3 _e g
g No.
Dale g
gg
,, g 5 Event uT 83 Action to a#0 o
$E di ji2 Repor
- p,,,,,,g,c,,,,,c, e
a 009 821018 F
14.8 G
3 NA Cll PUMPXX
. Reactor trip due to an inadvertent manual trip of the 1A feedwater pump.
A subsequent reactor trip occurred due to low steam generator level.
010 821023 F
22.0 G
3 NA EB INSTRU While adjusting the voltage regulator a generator trip occurred due to under-excitation of the main generator.
Prior to returning the unit to service two reactvr trips occurred due to low steam generator level.
[
I I
2 3
4 F: l'orced Re.non:
Method:
Exhibit G. Instructions S: Stheduled A fquipincro Failure (Explain) 1-Manual for Picparation of Data ll Mainicaance s.iTest 2 Manual Scrain.
Entry Sheets fos 1.icensee C-Itefuehog 3 Automatic Scrain.
Event Repos t (1.1 R) File iNUREG-D.Itegulatosy Restriction 4.Other (Explaisi) 0161) l'-Oper nior T aining & license Examination F.Adininisis.siive 5
G Opesatinual I.
.:(Explain)
LNhibit i. Sanie Sousee (9/77) 11 Gibei I E xpl.iui)