JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS October, 1982 l

In the month of October there were two (2) unit shutdowns.

The following safety-related maintenance was performed in the month of October:

1. Performed miscellaneous maintenance on diesel generators.
2. Replaced Reactor Coolant System Sample Valve V-23 with new valve.
3. Replaced Reactor Coolant. System Post Accident Sample System liquid sample spout.
4. Pumped sludge from the bottom of the //l Recycle Holdup Tank.

1 i

I e

1 8211220010 821115 PDR ADOCK 05000348 R

PDR

1 OPERATING DATA REPORT DOCKET NO. 50-348

,I DATE 11/04/82 COMPLETED BY W.G.llairston, III e

TELEPflONE (205)899-5156 I

OPERATING STATUS I. Unit Name:

Joseph M. Farley - Unit 1 Notes

2. Reporting Period:

October, 1982

1) Cumulative data since
3. Licensed Thermal Power (MWt):

2652 12/01/77, date of.

4. Nameplate Rating (Gross MWe):

edl geWom

5. Design Electrical Rating (Net MWe):

829

6. Masimum Dependable Capacity (Gross MWe):

844.6

7. Masimum Dependable Capacity (Net MWe):

803.6

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A

9. Power Lesel To Which Restricted,If Any(Net MWe):

N/A

10. Reasons For Restrictions,if Any:

N/A This Month Yr.-to Date Cumulatis e I1. Ilours in Reporting Period 745 7,296 43,104*

12. Number Of flours Reactor Was Critical 727 5,709.2 26,691
13. Reactor Reserve Shutdown llours 18 122.5 3,614.5_
14. Ilours Generator On.Line 708.2 5,487.3 25,817 II. Unit Reserve Shuidown flours O

O O

16. Gross Thermal Energy Generated (MWil)

E L10.147 13,779,051 64,723,962

17. Gross f!rctrical Energy Generated (MWil) 539 434_ _,

4,334,240 20,571,192

18. Net Electrical Energy Generated (MWil) 508.982 4.075,094 19,298,818
19. Unit Senice Factor 95.1 75,2 59.9
20. Unit Asailability Factor 95.1 75.2 59.9
21. Unit Capacity Factor (Using MDC Net) 85.0 69.5 55.7 1

22 Unit Capacity Factor (Using DER Net) 82.4 67.4 54.0

23. Unit Forced Outage Rate 4.9 24.5 19.0
24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Each3:

Refueling Outage; January 15, 1983; Approximately 11 weeks

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in lest Status (Prior io Commercial Operation):

Forecast Achiesed INIIIA L CRH ICAtli y 8/06/77 8/09/77 INITI AL El.l:C1RICIIY 8/20/77 8/18/77 COMMERCI A L OPER A llON 12/01/77 12/01/77

/

(9/77)

UfX.ht'l NO.

50-348 s

UNIT ;T.M.Farlev-Unit 1 DAlt 11/04/82 COMI'LETED tlY W.G.Hairston, III 1ELifl!ONE (205)899-5156 October McN111 DAY AVElt \\GE Il\\ll.Y l'Oh Eit LEVEL '

DAY AVER AGE IMILY l'0WEli L EVEL (Mhe Net)

(MWe Net) 801 17 809 g

802 1:;

410 2

t 802 19 106 3

4 20 395 793 790 73 781 5

791 806 6

22 794 23 380 7

792

.5 79 Qg 793 25 363 9

552 794 26 10 796 n

582

  • i; 795 742 12 3

13 795

9 806 g.;

30 808 802 807 806 15 3:

16 805 9

INS TittJCllONS

. n t!us I.irmir. liu u.* 2sange daily umt powe-level in MWe Net for each d:y in the reporting irainth. Connpute to

, the nesse t wl.ule nr.,'sa t r

G O

1

UNIT SilUlDOWNS AND POWER REDUCI10NS DOCKET NO.

50-348 I

UNIT NAME J. M. Farlev-Unit 1.

DATE 11/04/82 l

REPORT MONTil OCTOBER, 1982 COMPLETED llY W.G. Hairston, III l

TEl.EPif0NE (205) 899-5156 l

w.

6 'L Cause & Cosrective c

rs 3 sa :

E '.4 Licensee Sv.

~.,

.E e 8

g g'

No.

Date g

gg jgj Event u?

o-3 Action to

$5 5

j5g Repori #

ju

$0 p,,,,,,g,c,,,,,c, 6

009 821018 F

14.8 G

3 NA CH PUMPX'(

. Reactor trip due to an inadvertent manual trip of the 1A feedwater pump.

A subsequent reactor trip occurred due to low steam generator level.

010 821023 F

22.0 G

3 NA EB INSTRU While adjusting the voltage regulator a generator trip occurred due to under-excitation of the main generator.

Prior to returning the unit to service two reactor trips occurred due to low steam generator level.

I 2

3 4

F: Forced Reason:

Method:

Exhibit G. instructions S: Stheduled A Equipment Failure (Explain) 1 -Manual for Pseparation of Daia H. Maintenance ci Test 2 Manual Scram.

Enuy Sheels for l_icensee C Refuehag 3 Automatic Scram.

Event Repos (1.ER) FileINUREG.

D Regulatosy Resitiction 4-Other (Explaio) 0161)

E-Operator Training & license Examination F Administsative 5

G Opesational Enor (Explain)

Exhibit ! Same Source P7/77) 11 Othes (Explain)

e i

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 1 NARRATIVE

SUMMARY

OF OPERATIONS October, 1982 In the month of October there were two (2) unit shutdowns.

The following safety-related maintenance was performed in the month of October:

1. Performed miscellaneous maintenance on diesel generators.
2. Replaced Reactor Coolant System Sample Valve V-23 with new valve.
3. Replaced Reactor Coolant System Post Accident Sample System liquid sample spout.
4. Pumped sludge from the bottom of the #1 Recycle Holdup Tank.

If i

ol I

OPERATING DATA REPORT 50-348 I

DOCKET NO DATE 11/04/82

,l COMPLETED BY W.G.Hairston, III TELEPil0NE (205)899-5156 e

i I'

OPERATING STATUS Notes Joseph M. Farley - Unit 1

f. Unit Na.ne:

October, 1982

1) Cumulative data since
2. Reporting Period:

12/01/77, date of.

2652

3. Licensed Thennal Power (MWil:

c mmercial operation.

860

4. Nameplate Rating (Gross MWe):

829

5. Design Electrical Rating (Net MWe):

844.6

6. Masimum Dependable Capacity (Gross MWe):

803.6 I

7. Masimum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report.Gise Reasons:

N/A N/A

9. Power Lesel To Which Restricted,If Any (Net MWe):

N/A

10. Reasons For Restrictions.lf Any:

i t

This Month Yr.-to.Dat e Cumulathe

11. Ilours in Reporting Period 745 7,296 43,104-727 5,709.2 26,691
12. Number Of 11ours Reactor Was Critical 18 122.5 3,614.5
13. Reactor Resene Shutdown Hours 708.2 5,487.3 25,817
14. Ilours Generator On.Line 0

0 0

15. Unit Resene Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 1.710.147 13.779.051 64,723,962 539 634 4,334,240 20,571,192
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MhH) 508.982 4.075.094 19,298,818
19. Unit Senice Factor 95_1 75.2 59.9 95.1 75.2 59.9
20. Unit Availability Factor 85.0 69.5 55.7
21. Unit Capacity Factor (Using MDC Net) 82.4 67.4 54.0 l
22. Unit Capacity Factor (Using DER Net) 4.9 24.5 19.0
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Nest 6 Months iType. Date.and Duration of Eacht:

Refueling Outage; January 15, 1983; Approximately 11 weeks N/A

25. If Shut Down At End Of Report Period.1%timated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achiesed t

8/06/77 8/09/77 INITIA L CRITICALITv INITIAL ELEClRICITY 8/20/77 8/18/77 COMMERCIAL OPER ATION 12/01/77 12/01/77 "q

(9/77 )

DOCKL'l.*iO.

_50-348 UNIT J.M.Farlev-Unit 1 DA1E __1_1/04/82 CO.\\fPLETED 13y W.C.Hairston, III

/

1ELEPl!ONE (205)899-5156 October

.t!Offill DAY AVElt.\\GI' DAILY l't)hEit LEVEL DAY AVEl(AGE D \\ll't' POWEli LEVEL.

(.\\lwe ties) t,.11.e Net) 801 17 809 g,

802 13 410 2

802 19 106 3

395 793 2g

.g 781

_790 21 5

806 791 22 6

380 794 23 7

s, 792 79 g

363 793 23 7

~

552 794 X

10 582

'gg 796

7 742 795

,a 12 806 795

9 13 808 802 30 1.t 806

~

807 33 g5 805 16 INSiitUC110NS On this formit. list the stense daily umt power ! ciel us ?.lWe Net for each day en the repotimg namth. Compute to

, the nesse: whole ne;r att.

p(77) i q

a

UNIT SilUlDOWNS AND POWER REDUCTIONS DOCKET NO.

50-348 UNIT NAME J. M. Farlev-Unit 1 '

DATE 11/04/82 REPORT MONTil OCTOBER, 1982 COMPLETED BY W.G. llairston, III TE! LPHONE (205) 899-5156 w.

c c

e.

3:sX Licenwe P.,

c *.,

Cause & Coareceive L

.3 _e g

g No.

Dale g

gg

,, g 5 Event uT 83 Action to a#0 o

$E di ji2 Repor

  • p,,,,,,g,c,,,,,c, e

a 009 821018 F

14.8 G

3 NA Cll PUMPXX

. Reactor trip due to an inadvertent manual trip of the 1A feedwater pump.

A subsequent reactor trip occurred due to low steam generator level.

010 821023 F

22.0 G

3 NA EB INSTRU While adjusting the voltage regulator a generator trip occurred due to under-excitation of the main generator.

Prior to returning the unit to service two reactvr trips occurred due to low steam generator level.

[

I I

2 3

4 F: l'orced Re.non:

Method:

Exhibit G. Instructions S: Stheduled A fquipincro Failure (Explain) 1-Manual for Picparation of Data ll Mainicaance s.iTest 2 Manual Scrain.

Entry Sheets fos 1.icensee C-Itefuehog 3 Automatic Scrain.

Event Repos t (1.1 R) File iNUREG-D.Itegulatosy Restriction 4.Other (Explaisi) 0161) l'-Oper nior T aining & license Examination F.Adininisis.siive 5

G Opesatinual I.

.:(Explain)