Notice of Violation from Insp on 820621-25
ML20028A354
Person / Time
Site: Arkansas Nuclear  Entergy icon.png
Issue date: 10/25/1982
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20028A328 List:
References
50-313-82-14, 50-368-82-11, NUDOCS 8211180425
Download: ML20028A354 (1)


Text

.__

APPENDIX A NOTICE OF VIOLATION Arkansas Power and Light Company Dockets:'50-313/82-14 Arkansas Nuclear One, Units 1 & 2 50-368/82-11 As a result of an NRC inspection conducted during the period of June 21-25, 1982, and in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C), 47 FR 9987, dated March 9,1982, the following violation was identified:

10 CFR 71.5, " Transportation of Licensed Material," prohibits a licensee from delivering any licensed material to a carrier for transport or transporting licensed material, unless the licensee complies with the applicable requirements of the regulations appropriate to the mode of transport, of the Department of Transportation in 49 CFR Parts 170-189.

49 CFR 173.394, " Radioactive Materials in Special Form," and 49 CFR 173.395, " Radioactive Materials in Normal Form," require that Type A quantities of special and normal form radicactive material must be packaged for transport in a container meeting DOT specification 7A general packaging requirements and maintain on file, for at least one year after the latest shipment, a complete certification and supporting documentation that the package meets instruction and design requirements.

Contrary to the above, four shipments of radioactive materials shipped from the site between October 1981 and June 25, 1982, were shipped as Type A quantities in various containers, for which the licensee could not provide the container certification as required by 49 CFR 173.394 and 173.395.

This is a Severity Level IV Violation (Supplement V). (313/8214-23)

(368/8211-23).

Pursuant to the provisions of 10 CFR 2.201, Arkansas Power and Light Company is hereby required to submit to this office, within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) the corrective steps which have been taken and the results achieved; (2) the corrective steps which will be taken to avoid further violations; and l

(3) the date when full compliance will be achieved.

Consideration may be given to extending your response time for good cause shown.